25.06.2014 Views

SCEG OATT Formula Transmission Rate Filing.pdf - SCANA ...

SCEG OATT Formula Transmission Rate Filing.pdf - SCANA ...

SCEG OATT Formula Transmission Rate Filing.pdf - SCANA ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

20091231-0037 FERC PDF (Unofficia1) 12/29/2009<br />

Direct Testimony of Alan C. Heintz<br />

Docket ERIO·_-OOO<br />

Page 26 of28<br />

Exhibit No. SCE-8<br />

Southwest Power Pool, 96 FERC ~ 61,034 (2001); Alliance Cos., et al., 94 FERC<br />

2<br />

3<br />

~ 61,070 (2001), order on reh'g, 95 FERC ~ 61,182 (2001). The Commission has<br />

approved a stated rate for network service offered by several other transmission<br />

4<br />

providers,<br />

including Sierra Pacific Power Co. and Nevada Power Co. (Docket No.<br />

5<br />

6<br />

ER07-1371-000, 121 FERC ~ 61,160 (2007)); Northwestern Corp. (Docket No. ER07-<br />

46-000, 117 FERC ~ 61,293 (2006)); Sierra Pacific Resources Operating Cos. (Docket<br />

7<br />

No. ER03-1328-000,<br />

108 FERC ~ 61,023 (2004)); and International <strong>Transmission</strong> Co.,<br />

8<br />

9 Q.<br />

10<br />

II<br />

12<br />

13<br />

LLC (Docket No. EROO-3295-000, 92 FERC ~ 61,276 (2000)).<br />

PLEASE DISCUSS HOW THE FORMULA ACCOMODATES SCE&G'S<br />

PROPOSAL TO RECOVER, BEGINNING JUNE 1,2010, DEFERRED COSTS<br />

("GRlDSOUTH COSTS") IT INCURRED IN THE UNSUCCESSFUL ATTEMPT<br />

TO FORM THE PROPOSED REGIONAL TRANSMISSION OPERATOR,<br />

GRlDSOUTH.<br />

14 A.<br />

15<br />

On Attachment 5 - Cost Support, under the section title "Grid South Surcharge Cost<br />

Support", is shown for the year beginning 2004 the GridSouth costs SCE&G incurred<br />

16<br />

through 2003.<br />

This balance is discussed and supported in detail in the testimony of<br />

17<br />

SCE&G witness Charles A. White, Exhibit Nos. SCE-6 and SCE-7.<br />

Attachment 5 also<br />

18<br />

shows the calculation of the carrying charges (at the formula-determined<br />

ROR) for the<br />

19<br />

years 2004 through 2009 and the first five months of 20 10. This total - GridSouth costs<br />

20<br />

at BOY 2004 plus carrying charges through May of 2010 - is $24,967,230.<br />

It is the<br />

21<br />

22<br />

amount that SCE&G proposes to amortize (beginning June 1, 2010) over the five rateyear<br />

period beginning June 1,2010 and ending May 31,2015, as shown on Attachment 5.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!