20091231-0037 FERC PDF (Unofficia1) 12/29/2009<br />

Direct Testimony of Charles A. White<br />

Docket ERI O-~-OOO<br />

Page 8 ofl7<br />

Exhibit No. SCE-6<br />

I Q.<br />

DID GRIDSOUTH EVER BECOME OPERATIONAL?<br />

2 A.<br />

3<br />

4<br />

5<br />

6<br />

7<br />

8<br />

9<br />

10<br />

II<br />

12<br />

13<br />

14<br />

IS<br />

16<br />

17<br />

No. In November 2001, the FERC announced the establishment of state-federal regional<br />

panels to address RTO and seams issues and reflect state interests affected by RTO<br />

developments following the issuance of Order No. 2000. The panels convened during the<br />

winter and early spring 2002 and preceded the issuance of the FERC's standard market<br />

design NOPR in July 2002. During summer 2002, the Southeastern state commissions<br />

announced that they would undertake an analysis of the costs and benefits of forming<br />

three RTOs (including GridSouth) in the Southeast (SEARUC Study). In light of the<br />

SMD NOPR issuance and the announcement of the SEARUC Study, the GridSouth<br />

Sponsors decided to postpone filing applications with their respective state commissions<br />

for approval of the transfer of operational control of their transmission systems to<br />

GridSouth. The Sponsors also decided to take steps to mitigate the costs of continuing<br />

operations associated with the GridSouth implementation project. However, the<br />

Sponsors tried to balance their cost mitigation efforts with efforts to preserve the progress<br />

on implementing GridSouth that had been achieved to that point so that there would be a<br />

cost effective and orderly means by which to restart GridSouth when and if all regulatory<br />

approvals were obtained.<br />

18<br />

19<br />

20<br />

21<br />

22<br />

The SEARUC Study was issued November 6, 2002 and the FERC issued a "White<br />

Paper" subsequent to the SMD NOPR in April 2003. The GridSouth Sponsors filed<br />

comments in the SMD NOPR, White Paper, and the SEARUC Study as well as provided<br />

technical data and assistance to the consultants who prepared the SEARUC Study. The<br />

GridSouth Sponsors discussed the issues presented in all three documents with state