20091231-0037 FERC PDF (Unofficia1) 12/29/2009<br />

Direct Testimony of Alan C. Heintz<br />

Docket ER 10-_-000<br />

Page 12 of28<br />

functionalization purposes.<br />

Exhibit No. SCE-8<br />

The fonner are functionalized by the W&S allocator and the<br />

2 latter are functionalized by the net plant allocator (lines 46 through 48).<br />

3 Materials and supplies at line 53 consist of transmission-related balances at line 52, plus<br />

4 undistributed stores expenses functionalized to transmission by the W&S allocator at<br />

5 lines 49 through 51.<br />

6 Cash working capital is listed at lines 54 through 56 as one-eighth (12.5 percent) of total<br />

7 transmission O&M expense, which is listed at line 84.<br />

8 Line 57 contains the rate base adjustment identified as "Unrecovered Deferred GridSouth<br />

9 Costs", which is the unamortized balance of GridSouth costs. This entry will be<br />

10 discussed in more detail later in my testimony.<br />

II<br />

Network Credits (line 60) is a reduction to rate base equal to the net plant value of certain<br />

12 transmission facilities that may be built by SCE&G with funds advanced by customers to<br />

13 which credits will apply in the future. If applicable, this is calculated on Attachment 5.<br />

14 Note M explains that outstanding Network Credits "is the balance of Network Facilities<br />

15 Upgrades Credits due to <strong>Transmission</strong> Customers who have made lump sum payments<br />

16 (net of accumulated depreciation) towards the construction of Network <strong>Transmission</strong><br />

17 Facilities consistent with Paragraph 657 of Order 2003-A."<br />

18 Finally, <strong>Rate</strong> Base is calculated at line 62 as the sum of Net Plant (line 38) and Total<br />

19 Adjustment to <strong>Rate</strong> Base (line 61).<br />

20 (d) Operations and Maintenance Expense