20091231-0037 FERC PDF (Unofficia1) 12/29/2009<br />

Direct Testimony of Jimmy Addison<br />

Docket ER 10- -000<br />

Page 11 of19<br />

Exhibit No. SCE-J<br />

Base Load Review Act ("BLRA") for a certificate of environmental compatibility and<br />

2 public convenience and necessity and for a base load review order for the two nuclear<br />

3 units. Under the BLRA, the SCPSC conducted a review of the need for and prudency of<br />

4 the proposed units, as well as the engineering, procurement and construction contract<br />

5 under which the units will be built.<br />

6 In March 2008, SCE&G and the South Carolina Public Service Authority filed an<br />

7 application with the Nuclear Regulatory Commission ("NRC") for a combined<br />

8 construction and operating license ("COL"). The COL application was reviewed for<br />

9 completeness by the NRC and docketed on July 31, 2008. In September 2008 the NRC<br />

10 issued a 30-month review schedule from the docketing date to the issuance of the safety<br />

II evaluation report which would signify satisfactory completion of the NRC's review. Both<br />

12 the environmental and safety reviews by the NRC are in progress and a COL should be<br />

13 issued in mid- to late-20 II. This date would support both the project schedule and the<br />

14 substantial completion dates for the two new units in 2016 and 2019, respectively.<br />

15 SCE&G has begun development of the transmission facilities that are needed to move the<br />

16 nuclear generation to market in a fashion that ensures continued reliable operation of<br />

17 SCE&G's transmission system and all interconnected transmission systems. The planned<br />

18 transmission facilities are estimated to cost $582 million (in escalated dollars). That<br />

19 compares with total gross transmission plant investment today of $746 million. The<br />

20 combined cost of the two planned nuclear units and associated transmission is<br />

21 approximately $6.3 billion (in escalated dollars) which is 37% more than SCE&G's<br />

22 current total company depreciated rate base of$4.6 billion (as of September 30, 2009).