(1) FM 1986401 – 2.08 credits x $30,000 = $62,400 (Purchased Summer, 2001)<br />

(2) FM 1938851 - 1.19 credits x $30,000 = $35,700 (Purchased Spring, 2002)<br />

(3) FM 1941021 – 2.30 credits x $30,000 = $69,000 (Purchased Spring, 2002)<br />

(4) FM 1937911 - 0.27 credits x $30,000 = $8,100 (Purchased Summer, 2001)<br />

(5) FM 1986371– 7.22 credits x $30,000 = $216,600 (Purchased Summer, 2001)<br />

(6) FM 1986371– 5.82 credits x $30,000 = $174,600 (Purchased Spring 2002)<br />

(7) FM 1937981 - 3.58 credits x $30,000 = $107,400 (Purchased Summer, 2001)<br />

(8) FM 4154901 – 0.93 credit x $92,000 = $85,560 (Purchased Summer, 2008)<br />

ATTACHMENTS<br />

1. Detailed description of pre- & post-construction activities & conditions. Reference previous discussion, ACOE<br />

& SWFWMD Permits, attached pre-post construction aerials.<br />

2. Location map and design drawings of existing and proposed conditions. Figure A – Location Map, Figures B &<br />

C, Pre-Construction & Existing Habitat Conditions.<br />

3. Schedule for work implementation. Construction activities are complete, current maintenance, monitoring,<br />

and land management activities.<br />

4. Success criteria, maintenance & monitoring plan. Success criteria, maintenance & monitoring for<br />

enhancement & restoration of habitats are specified in the BRMB permits.<br />