Center Wetland Restoration (2005) – construction of the 2-acre “Gator Pond” in the<br />

adjacent southwestern upland pasture provided the fill material necessary to construct<br />

the Center Road (3,000 ft. long) and Eastern Road (2,300 ft. long).<br />

Center Wetland Restoration (2006) – sodding sideslopes along the constructed<br />

Center Road berm. The Center and Eastern Roads have evenly spaced culvert sets to<br />

evenly disperse the contributing sheet water flow through the restored wetlands.<br />

<strong>FDOT</strong> <strong>Mitigation</strong> Site<br />

(Peace River Basin)<br />

CIRCLE B BAR RESERVE<br />

(SW 66)<br />

226