Summer, 2000 – prior to construction, monitor wells installed within wetlands have<br />

water levels consistently 4-5 feet below grade. No water stains on the well casings<br />

indicate the lack of adequate & appropriate hydroperiods.<br />

Summer, 2009 – as evident by the water stains on the well casing,<br />

restored hydrology has resulted in appropriate surface water hydroperiods<br />

within the wetlands during the rainy season.<br />

<strong>FDOT</strong> – District 1 <strong>Mitigation</strong> Project<br />

(Hillsborough River Basin)<br />

SW 55 – UPPER HILLSBOROUGH 4&5<br />