E. Brief explanation of why a mitigation bank was/was not chosen, in whole or in part, including a<br />

discussion of cost: No mitigation banks were available in the Manatee River watershed during mitigation<br />

selection in 1998.<br />

F. Brief explanation of why a SWIM project was/was not chosen as mitigation, in whole or in part, including<br />

a discussion of cost, if the anticipated impacts are located within a SWIM water body: The mitigation activities<br />

are in conjunction with a SWIM project located on FDEP property in need of major habitat restoration &<br />

enhancement.<br />

MITIGATION PROJECT IMPLEMENTATION<br />

Entity responsible for construction: Private Contractor selected by the WMD & FDEP<br />

Entity responsible for monitoring and maintenance: Maintenance by FDEP staff assigned to the Terra Ceia<br />

Preserve, monitoring conducted through 2008 by consultant on contract with the WMD; perpetual maintenance<br />

& periodic monitoring after 2008.<br />

Time frame for implementation: Commence: Design in 2000-2001 Complete: Exotic species eradication &<br />

planting, 2002; routine herbicide maintenance periodically conducted as necessary by FDEP staff<br />

Project cost: $ 46,000<br />

ATTACHMENTS<br />

1. Description and depiction of pre-post construction activities. Refer to previous text, Figure A aerial of project<br />

location, Figure B aerial (1999) of pre-construction conditions, Figure C aerial (2009) of current habitat conditions,<br />

and site photos of pre-post habitat conditions. Additional site and design details are available through the SWFWMD’s<br />

SWIM Section and <strong>FDOT</strong> <strong>Mitigation</strong> Program Manager.<br />

2. Detailed schedule for work implementation, including any and all phases. The exotic species were eradicated and<br />

the area planted in 2002.<br />

3. Success criteria and associated monitoring plan. The success criteria includes less than 5% cover of exotic<br />

species for the 20- acre area providing mitigation for <strong>FDOT</strong> wetland impacts. Qualitative monitoring occurred through<br />

2008 to ensure success.<br />

4. Long term maintenance plan. The mitigation is associated within larger restoration objectives for the Preserve.<br />

The maintenance of the project area is being conducted by FDEP staff, primarily related to herbicide eradication of<br />

invasive exotic vegetation and limiting such coverage to less than 5%.<br />