F. Brief explanation of why a SWIM project was/was not chosen as mitigation, in whole or in part, including<br />

a discussion of cost, if the anticipated impacts are located within a SWIM water body: Cattle Dock, Phases I<br />

and II were SWIM sponsored projects constructed on property co-owned and managed by the SWFWMD and FDEP.<br />

MITIGATION PROJECT IMPLEMENTATION<br />

Entity responsible for construction: Construction completed in 2005 by private contractor working for the WMD.<br />

Entity responsible for monitoring and maintenance: Private consultants on contract with the SWFWMD<br />

conducted semi-annual monitoring through 2009; periodic monitoring conducted by WMD staff and herbicide<br />

maintenance conducted by FDEP staff as part of normal land management activities.<br />

Time frame for implementation: Commenced: <strong>Plan</strong>ning & Design - July, 1999 Completed: Construction –<br />

2004-2005, maintenance & monitoring – 2005-2009, perpetual maintenance & management by FDEP<br />

Project cost:<br />

$ 710,000 (total)<br />

$ 100,000 design, permitting<br />

$ 610,000 construction, planting, maintenance and monitoring<br />

ATTACHMENTS<br />

1. Description and depiction of pre-post construction activities. Refer to previous text, Figure A aerial of project<br />

location, Figure B aerial (1999) of pre-construction conditions, Figure C aerial (2005) for on-going construction<br />

activities, Figure D aerial (2008) for current vegetative conditions, and site photos for pre-post habitat conditions.<br />

Additional site and design details are available through the SWFWMD’s SWIM Section and <strong>FDOT</strong> <strong>Mitigation</strong> Program<br />

Manager.<br />

2. Schedule for work implementation. Construction of Phase I was completed in the summer, 2001 and achieved<br />

success criteria by 2004. Phase II construction and planting were completed in the summer, 2005, followed by four<br />

years of periodic maintenance & semi-annual monitoring, perpetual management & maintenance to eradicate exotic<br />

and nuisance vegetation is conducted by FDEP staff assigned to the Charlotte Harbor State Preserve.<br />

3. Success criteria and associated monitoring plan. The success criteria has been achieved and reflects a minimum<br />

70% coverage of desirable species in the project area, and less than 5% coverage of exotic and nuisance species.<br />

Monitoring was conducted four years post-construction to evaluate species survival, percent cover, invasive exotic<br />

plants, and maintenance activities conducted to ensure and enhance habitat conditions. Periodic monitoring is<br />