07.09.2014 Views

2012 FDOT Mitigation Plan - Southwest Florida Water Management ...

2012 FDOT Mitigation Plan - Southwest Florida Water Management ...

2012 FDOT Mitigation Plan - Southwest Florida Water Management ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Summer, 2009 – same view as the previous photos. The restored wetland grade has<br />

naturally generated with herbs such as maidencane and broomsedge.<br />

<strong>Plan</strong>ted cypress and generated hardwoods & shrubs (e.g. red maple, sweet gum,<br />

wax myrtle) are present along the forested wetland edge (left).<br />

Summer, 2009 – majority of cypress planted within filled ditch has grown to heights<br />

taller than 20 ft., with hardwood saplings recruiting & generating within herbs.<br />

<strong>FDOT</strong> – District 1 <strong>Mitigation</strong> Project<br />

(Hillsborough River Basin)<br />

SW 55 – UPPER HILLSBOROUGH 4&5<br />

125

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!