1. Description of existing site and proposed work. Refer to previous discussion; additional details and the associated<br />

surface water modeling available for review at the SWFWMD or <strong>FDOT</strong> <strong>Mitigation</strong> Program Manager.<br />

2. Aerial & site photographs. Refer to Figures A & B, 2006 aerials; and 1994 infrared photograph (Figures C & D), preconstruction<br />

site photos.<br />

3. Location map and design drawings of existing and proposed conditions. Refer to Figures A & B for location map,<br />

Figure C for existing conditions, and Figure D for proposed conditions.<br />

4. Schedule for work implementation, including any and all phases. Refer to previous implementation discussion.<br />

Additional details will be provided in the annual updates of the <strong>FDOT</strong> mitigation plan as the project proceeds through<br />

various phases and activities. The following is a tentative schedule:<br />

Site Evaluation, Surface <strong>Water</strong> Modeling, Design & Permitting – 2006 - 2008<br />

Construction & <strong>Plan</strong>ting – 2009<br />

Maintenance – 2010-<strong>2012</strong>-Semi-annual reviews and routine maintenance to ensure structures are properly functioning<br />

with no erosion. Additional reviews will be conducted as necessary when floodwaters are flowing over the wet<br />

crossings of the access road.<br />

<strong>Management</strong> – 2-3 annual evaluations conducted by WMD Land <strong>Management</strong> Specialist assigned to the site as part of<br />

normal land management activities, to ensure the structures are functioning as proposed and no erosion or problems<br />

with structural integrity.<br />

5. Success criteria and associated monitoring plan. After two years of semi-annual monitoring, the 2-3 annual<br />

evaluations will be conducted concurrently with review and associated maintenance of the access road. This<br />

monitoring activity and associated success criteria will be conducted to ensure that the wet crossing and rubble rip-rap<br />

allows desired flow conditions. The WMD maintains a water level monitoring station where SR 200 crosses the<br />

Withlacoochee River, so it will be known in advance of when flood waters breach over the river and banks and the wet<br />

crossings. Success includes ensuring the structures are functioning as proposed and any maintenance activities<br />

conducted as quickly as possible.<br />

6. Long term maintenance plan. The road is periodically used by SWFWMD Land Resource staff to access the site.<br />

Any activities to maintain the flow connectivity will be conducted when necessary.<br />

534