07.09.2014 Views

2012 FDOT Mitigation Plan - Southwest Florida Water Management ...

2012 FDOT Mitigation Plan - Southwest Florida Water Management ...

2012 FDOT Mitigation Plan - Southwest Florida Water Management ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Some fill material removal and the 2003 grading of the field<br />

was conducted to create a circular ephemeral freshwater marsh.<br />

The ephemeral marsh (dominant coverage of bulrush, bacopa, and maidencane)<br />

has minimal depth and short duration hydroperiods, allowing for more wildlife<br />

foraging opportunities. The only freshwater marsh in the vicinity, it is buffered by<br />

restored and enhanced coastal hammock and flatwood habitat (background).<br />

<strong>FDOT</strong> – District 7 <strong>Mitigation</strong> Project<br />

(Tampa Bay Drainage Basin)<br />

SW 62 – TAPPAN TRACT<br />

182

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!