07.09.2014 Views

2012 FDOT Mitigation Plan - Southwest Florida Water Management ...

2012 FDOT Mitigation Plan - Southwest Florida Water Management ...

2012 FDOT Mitigation Plan - Southwest Florida Water Management ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Western Wetland Restoration (2006) – canal (right edge) has been filled & removal<br />

of western boundary levee (lower foreground) has restored the sheet flow hydrology.<br />

Western Wetland Restoration (2009) – the majority of this wetland area was historically<br />

forested so appropriate tree and shrub species were planted along with herbs during 2006<br />

and have been successfully maturing and providing wildlife habitat.<br />

<strong>FDOT</strong> <strong>Mitigation</strong> Site<br />

(Peace River Basin)<br />

CIRCLE B BAR RESERVE<br />

(SW 66)<br />

224

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!