07.09.2014 Views

2012 FDOT Mitigation Plan - Southwest Florida Water Management ...

2012 FDOT Mitigation Plan - Southwest Florida Water Management ...

2012 FDOT Mitigation Plan - Southwest Florida Water Management ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Project cost: None proposed through 2010. Credit estimate will be based on the UMAM assessment of the<br />

wetland impact areas proposed for future roadway projects submitted to the <strong>FDOT</strong> program.<br />

ATTACHMENTS<br />

1. Description of existing site and proposed work. Refer previous discussion, SWFWMD ERP #43003997.005,<br />

ACOE #SAJ-2003-7594-IP-MGH, attached site photos.<br />

2. Recent aerial photograph. Refer to Figures B & C.<br />

3. Location map and design drawings. Refer to Figure A (location map), Figure B (existing conditions), and<br />

Figure C (proposed habitat).<br />

4. Schedule for work implementation. Refer to previous implementation discussion.<br />

5. Success criteria and associated monitoring plan. Monitoring and success criteria for habitat enhancement are<br />

specified in the issued permits for the mitigation bank.<br />

6. Long term maintenance plan. A perpetual maintenance and land management plan has been prepared<br />

(reference Figure D) that addresses vegetative maintenance and fire management.<br />

503

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!