07.09.2014 Views

2012 FDOT Mitigation Plan - Southwest Florida Water Management ...

2012 FDOT Mitigation Plan - Southwest Florida Water Management ...

2012 FDOT Mitigation Plan - Southwest Florida Water Management ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Summer, 2009 – the preserved laurel oak on the slight mound (center) was present<br />

along the lower inner edge of the tram road; the removed road (left) and filled ditch<br />

(right) has naturally generated ephemeral wetland habitat with slash pine & maple<br />

recruited over generated sedges.<br />

Summer, 2009 – this filled ditch and removed road segment has generated dense<br />

coverage of maidencane and soft rush that recruited from adjacent cypress dome.<br />

<strong>FDOT</strong> – District 1 <strong>Mitigation</strong> Project<br />

(Hillsborough River Basin)<br />

SW 55 – UPPER HILLSBOROUGH 4&5<br />

127

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!