07.09.2014 Views

notebook - Southwest Florida Water Management District

notebook - Southwest Florida Water Management District

notebook - Southwest Florida Water Management District

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

1. Locations – Aerial Photo(s)<br />

a. Property boundaries<br />

b. Legend, scale, and north arrow<br />

c. Soil boring / test well locations<br />

d. Mining Unit / area boundaries<br />

e. All proposed monitor wells / piezometers and staff gages comprising the monitoring<br />

network, including:<br />

i. latitude and longitude<br />

ii. vertical datum<br />

iii. DID and User ID numbers<br />

2. Soil boring logs, including:<br />

a. Vertical scale<br />

b. Soil profile and description<br />

c. Appropriate supporting text<br />

3. Proposed monitor well / piezometer design specifications, including proposed depth and screen<br />

interval.<br />

<br />

<br />

1. Locations – Aerial Photo(s)<br />

a. Property boundaries<br />

b. Legend, scale, and north arrow<br />

c. Soil boring / test well locations<br />

d. Geologic and model cross section locations<br />

e. Mining Unit / area boundaries<br />

f. Mine cut locations, mining direction, and estimated mining date<br />

g. Preservation area boundaries within the mine area and within the permitted drawdown<br />

mandatory mitigation (“setback”) distance<br />

h. All proposed mitigation features, e.g., water table intercept (“recharge”) ditches<br />

i. All monitor wells / piezometers and staff gages comprising the monitoring network<br />

2. Proposed monitor well / piezometer design specifications (if not previously provided with<br />

monitoring plan)<br />

2. Proposed / expected dates(s) of construction of the drawdown mitigation feature(s)<br />

3. Proposed / expected dates of initiation and termination of dewatering within the drawdown<br />

mitigation distance<br />

4. Proposed / expected date of completion of reclamation within the drawdown mitigation distance<br />

5. Mitigation Method and Design<br />

a. Narrative / description of the proposed mitigation technique (s)<br />

b. <strong>Water</strong> source(s) for mitigation<br />

103

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!