notebook - Southwest Florida Water Management District

swfwmd.state.fl.us

notebook - Southwest Florida Water Management District

1. Locations – Aerial Photo(s)

a. Property boundaries

b. Legend, scale, and north arrow

c. Soil boring / test well locations

d. Mining Unit / area boundaries

e. All proposed monitor wells / piezometers and staff gages comprising the monitoring

network, including:

i. latitude and longitude

ii. vertical datum

iii. DID and User ID numbers

2. Soil boring logs, including:

a. Vertical scale

b. Soil profile and description

c. Appropriate supporting text

3. Proposed monitor well / piezometer design specifications, including proposed depth and screen

interval.



1. Locations – Aerial Photo(s)

a. Property boundaries

b. Legend, scale, and north arrow

c. Soil boring / test well locations

d. Geologic and model cross section locations

e. Mining Unit / area boundaries

f. Mine cut locations, mining direction, and estimated mining date

g. Preservation area boundaries within the mine area and within the permitted drawdown

mandatory mitigation (“setback”) distance

h. All proposed mitigation features, e.g., water table intercept (“recharge”) ditches

i. All monitor wells / piezometers and staff gages comprising the monitoring network

2. Proposed monitor well / piezometer design specifications (if not previously provided with

monitoring plan)

2. Proposed / expected dates(s) of construction of the drawdown mitigation feature(s)

3. Proposed / expected dates of initiation and termination of dewatering within the drawdown

mitigation distance

4. Proposed / expected date of completion of reclamation within the drawdown mitigation distance

5. Mitigation Method and Design

a. Narrative / description of the proposed mitigation technique (s)

b. Water source(s) for mitigation

103

More magazines by this user
Similar magazines