The Contractor shall ensure that all flammable materials are used <strong>and</strong> stored in accordance with the<br />

Explosives <strong>and</strong> Dangerous Goods Act <strong>and</strong> any other statute or regulation governing storage <strong>and</strong> use<br />

<strong>of</strong> such materials, <strong>and</strong> shall obtain such permits <strong>and</strong> licenses <strong>and</strong> pay all relevant fees <strong>and</strong> charges.<br />

P10<br />

VANDALISM<br />

The Contractor shall allow <strong>for</strong> all reasonable measures to protect the Works <strong>and</strong> the operations<br />

therein from acts <strong>of</strong> v<strong>and</strong>alism. The Contractor shall allow <strong>for</strong> any remedial action required as a<br />

consequence <strong>of</strong> such acts. V<strong>and</strong>alism shall not be an excluded risk.<br />

P11<br />

HOURS OF WORK<br />

Unless with prior approval in writing from the Engineer, the Contractor shall not conduct <strong>works</strong> on<br />

Sundays, Public Holidays or between the hours <strong>of</strong> 6 pm on any day <strong>and</strong> 7 am on the following day<br />

except those <strong>works</strong> required in respect to safety or maintenance <strong>of</strong> Site conditions, such as<br />

dewatering activities.<br />

P12<br />

CODES AND AUSTRALIAN STANDARDS<br />

Where an Australian St<strong>and</strong>ard is specified, the Contractor shall construct <strong>and</strong> conduct the Works in<br />

accordance with the provisions <strong>of</strong> that st<strong>and</strong>ard. Where an Australian St<strong>and</strong>ard has not been<br />

specified, the Contractor shall allow <strong>for</strong> the <strong>construction</strong> <strong>of</strong> the Works in compliance with the<br />

provisions <strong>of</strong> the Australian St<strong>and</strong>ard covering the class or type <strong>of</strong> work being constructed.<br />

In the event that a St<strong>and</strong>ard other than an Australian St<strong>and</strong>ard is specified, the Contractor shall allow<br />

<strong>for</strong> complying with the provisions <strong>of</strong> the specified St<strong>and</strong>ard. The St<strong>and</strong>ard applying shall be the latest<br />

edition at the time <strong>of</strong> commencement <strong>of</strong> the Contract.<br />

Copies <strong>of</strong> Australian St<strong>and</strong>ards may be purchased from the St<strong>and</strong>ards Association <strong>of</strong> Australia.<br />

The following documents shall apply to this Contract.<br />

AS1012<br />

AS1141<br />

AS1160<br />

AS1181<br />

AS1289<br />

AS1348<br />

AS1379<br />

AS1470<br />

AS1597<br />

AS1646<br />

Methods <strong>of</strong> Testing Concrete<br />

Methods <strong>for</strong> Sampling <strong>and</strong> Testing Aggregates<br />

Bitumen Emulsions <strong>for</strong> Construction <strong>and</strong> Maintenance <strong>of</strong> Pavements<br />

Method <strong>of</strong> Measurement <strong>of</strong> Civil Engineering Works <strong>and</strong> Associated Building<br />

Works<br />

Methods <strong>of</strong> Testing Soils <strong>for</strong> Engineering Purposes<br />

Glossary <strong>of</strong> Terms-Road <strong>and</strong> Traffic Engineering<br />

Specification <strong>and</strong> Supply <strong>of</strong> Concrete<br />

Health <strong>and</strong> Safety at Work - Principles <strong>and</strong> Practices<br />

Precast Rein<strong>for</strong>ced Concrete Box Culverts<br />

Elastomeric Seals <strong>for</strong> Water Works Purposes<br />

AS1742<br />

Manual <strong>of</strong> Uni<strong>for</strong>m Traffic Control Devices<br />

5<br />

Specification <strong>for</strong> Subdivision Construction <strong>of</strong> Road Works <strong>and</strong> Drainage<br />

Rev. 1 – February 2013