Where existing buildings are located within 50m <strong>of</strong> any work area or where buildings may be affected<br />

by the <strong>works</strong>, the Contractor shall have a dilapidation survey <strong>of</strong> each building undertaken by the<br />

Contractor's insurers prior to commencement <strong>of</strong> work. A copy <strong>of</strong> the survey report shall be provided<br />

to the Engineer within seven (7) days <strong>of</strong> its completion.<br />

P28<br />

TRAFFIC MANAGEMENT PLAN<br />

The Contractor shall prepare a Traffic Management Plan <strong>for</strong> all <strong>works</strong> that abut or are on existing<br />

public <strong>road</strong>s in accordance with Main Roads WA Traffic Management <strong>for</strong> Road<strong>works</strong> Code <strong>of</strong> Practice<br />

<strong>and</strong> shall obtain approval <strong>of</strong> the Traffic Management Plan from the controlling Road Authority.<br />

The Contractor shall follow the approved Traffic Management Plan during the conduct <strong>of</strong> the work.<br />

P29<br />

SPECIFICATION TO BE TREATED AS A WHOLE<br />

Where the <strong>specification</strong> is separated into titled sections it is <strong>for</strong> convenience only <strong>and</strong> not to dictate or<br />

determine the trade or craft involved. Such separations shall not operate to make the Shire an arbiter<br />

<strong>for</strong> the division <strong>of</strong> responsibility between the Contractor <strong>and</strong> Sub-Contractors, <strong>and</strong> between Sub-<br />

Contractors, nor shall separation relieve the Contractor <strong>of</strong> responsibility <strong>for</strong> the satisfactory completion<br />

<strong>of</strong> the entire work.<br />

Specification <strong>for</strong> Subdivision Construction <strong>of</strong> Road Works <strong>and</strong> Drainage<br />

Rev. 1 – February 2013<br />

11

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!