E9.1 Dry Seeding<br />

A mixture <strong>of</strong> endemic local groundcovers <strong>and</strong> shrubs, as specified by the local authority, shall be<br />

sown using an approved seed drill attached to a tractor.<br />

The mixture shall be applied at the rate <strong>of</strong> not less than 120kg/ha.<br />

The rows <strong>of</strong> seeds shall, wherever practicable, run parallel to the contours <strong>of</strong> the ground surface.<br />

The whole area shall, upon completion <strong>of</strong> the seeding, be lightly raked to remove wheel tracks etc.,<br />

<strong>and</strong> present a smooth even surface.<br />

E9.2 Hydromulch<br />

Hydromulch shall consist <strong>of</strong> mulch <strong>and</strong> stabiliser applied by mechanical spray.<br />

Stabiliser shall be Ecologel 42, or Curasol AG45, applied at 250 l/ha.<br />

Mulch shall be <strong>of</strong> a paper mache type.<br />

Prior to hydromulching all areas to be treated shall be graded so as to present an even surface on<br />

completion <strong>of</strong> the hydromulch application.<br />

E9.3 Temporary Stabilisation<br />

Temporary stabilisation shall be undertaken as required by the Engineer by the application <strong>of</strong> an<br />

organic stabiliser, protect coat K61 or similar <strong>and</strong> water mix. The mix may be sprayed onto the Site<br />

by water cart.<br />

E9.4 Spreading Shredded Vegetation<br />

Shredded vegetation shall be evenly spread over disturbed ground, other than building sites, as<br />

directed by the Engineer.<br />

E10<br />

SITE PRESENTATION<br />

All verges shall be backbladed <strong>and</strong> graded so as to present an even surface. This shall be completed<br />

prior to stabilization <strong>works</strong>.<br />

Specification <strong>for</strong> Subdivision Construction <strong>of</strong> Road Works <strong>and</strong> Drainage<br />

Rev. 1 – February 2013<br />

15