E<br />

SITE PREPARATION AND EARTHWORKS<br />

E1<br />

GENERAL<br />

The Contractor shall allow <strong>for</strong> clearing, excavation, backfilling, compaction <strong>and</strong> dewatering in any<br />

material that may be encountered on site. The Contractor shall deposit all materials that cannot be<br />

used in the <strong>works</strong> at an approved refuse disposal site. The Contractor shall allow <strong>for</strong> all costs <strong>and</strong><br />

charges in connection with the removal <strong>and</strong> disposal <strong>of</strong> such materials.<br />

E2<br />

TOLERANCES<br />

Item<br />

Tolerance<br />

Clearing <strong>and</strong> Grubbing<br />

(Width <strong>of</strong> Design Earth<strong>works</strong> plus 2.0m) ∀ 0.5m<br />

Earth<strong>works</strong><br />

- overall level<br />

- top <strong>and</strong> toe <strong>of</strong> cut <strong>and</strong> fill batters<br />

- <strong>drainage</strong> basins<br />

+ 50mm -0mm<br />

∀ 100mm<br />

+ 0mm -100mm<br />

Verge Level<br />

+ 25mm -0mm<br />

Top Soiling<br />

- thickness minimum + 50mm<br />

- 20mm<br />

E3<br />

CLEARING<br />

The clearing shall consist <strong>of</strong> removal <strong>for</strong> the entire width <strong>of</strong> the <strong>for</strong>mation area <strong>and</strong> those cut <strong>and</strong> fill<br />

areas designated in the drawings <strong>of</strong> all trees, stumps <strong>and</strong> other vegetation, boulders <strong>and</strong> rubbish. All<br />

such material shall be removed to a depth <strong>of</strong> 600mm from the finished surface.<br />

12<br />

Specification <strong>for</strong> Subdivision Construction <strong>of</strong> Road Works <strong>and</strong> Drainage<br />