specification for subdivision construction of road works and drainage
specification for subdivision construction of road works and drainage
specification for subdivision construction of road works and drainage
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
E<br />
SITE PREPARATION AND EARTHWORKS<br />
E1<br />
GENERAL<br />
The Contractor shall allow <strong>for</strong> clearing, excavation, backfilling, compaction <strong>and</strong> dewatering in any<br />
material that may be encountered on site. The Contractor shall deposit all materials that cannot be<br />
used in the <strong>works</strong> at an approved refuse disposal site. The Contractor shall allow <strong>for</strong> all costs <strong>and</strong><br />
charges in connection with the removal <strong>and</strong> disposal <strong>of</strong> such materials.<br />
E2<br />
TOLERANCES<br />
Item<br />
Tolerance<br />
Clearing <strong>and</strong> Grubbing<br />
(Width <strong>of</strong> Design Earth<strong>works</strong> plus 2.0m) ∀ 0.5m<br />
Earth<strong>works</strong><br />
- overall level<br />
- top <strong>and</strong> toe <strong>of</strong> cut <strong>and</strong> fill batters<br />
- <strong>drainage</strong> basins<br />
+ 50mm -0mm<br />
∀ 100mm<br />
+ 0mm -100mm<br />
Verge Level<br />
+ 25mm -0mm<br />
Top Soiling<br />
- thickness minimum + 50mm<br />
- 20mm<br />
E3<br />
CLEARING<br />
The clearing shall consist <strong>of</strong> removal <strong>for</strong> the entire width <strong>of</strong> the <strong>for</strong>mation area <strong>and</strong> those cut <strong>and</strong> fill<br />
areas designated in the drawings <strong>of</strong> all trees, stumps <strong>and</strong> other vegetation, boulders <strong>and</strong> rubbish. All<br />
such material shall be removed to a depth <strong>of</strong> 600mm from the finished surface.<br />
12<br />
Specification <strong>for</strong> Subdivision Construction <strong>of</strong> Road Works <strong>and</strong> Drainage<br />
Rev. 1 – February 2013