24.10.2014 Views

specification for subdivision construction of road works and drainage

specification for subdivision construction of road works and drainage

specification for subdivision construction of road works and drainage

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

D<br />

D1<br />

DRAINAGE<br />

GENERAL<br />

Stormwater drains <strong>and</strong> subsoil drains shall be constructed in accordance with the <strong>drainage</strong> layout<br />

plans.<br />

Pile <strong>and</strong> keel or bearers will be required in s<strong>of</strong>t ground <strong>and</strong> where drains cross existing services.<br />

Drain <strong>construction</strong> shall take place in dry conditions <strong>and</strong> where necessary the Contractor shall provide<br />

dewatering equipment to ensure such suitable conditions exist.<br />

D2<br />

TOLERANCES<br />

Specification <strong>for</strong> Subdivision Construction <strong>of</strong> Road Works <strong>and</strong> Drainage<br />

Rev. 1 – February 2013<br />

16

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!