specification for subdivision construction of road works and drainage
specification for subdivision construction of road works and drainage
specification for subdivision construction of road works and drainage
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
D<br />
D1<br />
DRAINAGE<br />
GENERAL<br />
Stormwater drains <strong>and</strong> subsoil drains shall be constructed in accordance with the <strong>drainage</strong> layout<br />
plans.<br />
Pile <strong>and</strong> keel or bearers will be required in s<strong>of</strong>t ground <strong>and</strong> where drains cross existing services.<br />
Drain <strong>construction</strong> shall take place in dry conditions <strong>and</strong> where necessary the Contractor shall provide<br />
dewatering equipment to ensure such suitable conditions exist.<br />
D2<br />
TOLERANCES<br />
Specification <strong>for</strong> Subdivision Construction <strong>of</strong> Road Works <strong>and</strong> Drainage<br />
Rev. 1 – February 2013<br />
16