specification for subdivision construction of road works and drainage
specification for subdivision construction of road works and drainage
specification for subdivision construction of road works and drainage
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
R<br />
R1<br />
ROADWORKS<br />
TOLERANCES<br />
Pavement <strong>construction</strong> shall comply with the following tolerances <strong>and</strong> the surface shape shall be such<br />
that water cannot pond at any point.<br />
TOLERANCE<br />
COMPONENT<br />
THICKNESS LEVEL SHAPE<br />
(DEPARTURE FROM 3M<br />
STRAIGHT EDGE)<br />
WIDTH<br />
Sub Grade - + 10mm<br />
- 30mm<br />
- + 200mm<br />
- 0mm<br />
Sub Base<br />
+ 15mm<br />
+ 10mm<br />
- + 200mm<br />
- 0mm<br />
- 20mm<br />
- 0mm<br />
Base-course<br />
+ 10mm<br />
+ 5mm<br />
5mm<br />
+ 100mm<br />
- 0mm<br />
- 10mm<br />
- 0mm<br />
Seal Surface<br />
+ 5mm<br />
5mm<br />
+ 100mm<br />
-10mm<br />
- 0mm<br />
5mm<br />
23<br />
Specification <strong>for</strong> Subdivision Construction <strong>of</strong> Road Works <strong>and</strong> Drainage<br />
Rev. 1 – February 2013