24.10.2014 Views

specification for subdivision construction of road works and drainage

specification for subdivision construction of road works and drainage

specification for subdivision construction of road works and drainage

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

The aggregate shall be clean <strong>and</strong> uni<strong>for</strong>mly graded from 2mm to 10mm.<br />

The aggregate shall have a minimum thickness <strong>of</strong> 150mm all round pipe or strip drain.<br />

The Contractor shall undertake a particle size distribution analysis <strong>of</strong> the soil prior to selection <strong>of</strong> the<br />

filter fabric <strong>and</strong> shall <strong>for</strong>ward the results to the Engineer.<br />

The ge<strong>of</strong>abric filter sock shall be non woven <strong>and</strong> have the following filtration requirements in relation<br />

to the soil being drained;<br />

D 5OS < 75Φm<br />

EOS < D 85S<br />

EOS < 2.5 x D 50S<br />

generally<br />

EOS > D 15S<br />

EOS < 200 Φm<br />

G > 900<br />

(EOS equivalent open size <strong>of</strong> fabric)<br />

D13<br />

'AS CONSTRUCTED INFORMATION<br />

The Contractor shall ensure that no part <strong>of</strong> the work is backfilled or otherwise covered until 'as<br />

constructed= in<strong>for</strong>mation has been obtained.<br />

The <strong>drainage</strong> >as constructed= in<strong>for</strong>mation shall include, but need not be limited to the following:<br />

• type <strong>of</strong> structure;<br />

• pipe invert levels at all structures;<br />

• grade <strong>of</strong> pipes <strong>and</strong> open drains;<br />

• distance between structures;<br />

• pipe size <strong>and</strong> class;<br />

• invert levels <strong>of</strong> open drains <strong>and</strong> dimensions <strong>of</strong> basins;<br />

• cross-section <strong>of</strong> open drains;<br />

• change <strong>of</strong> locations e.g. line alignments tied to properties/lot boundaries.<br />

Such in<strong>for</strong>mation shall be certified by the Contractor's Surveyor <strong>and</strong> <strong>for</strong>warded to the Shire. Practical<br />

Completion will not be issued until a compliant <strong>drainage</strong> >as constructed= drawing is provided.<br />

Specification <strong>for</strong> Subdivision Construction <strong>of</strong> Road Works <strong>and</strong> Drainage<br />

Rev. 1 – February 2013<br />

22

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!