The Contractor shall allow <strong>for</strong> any means necessary <strong>for</strong> adjusting the moisture content <strong>of</strong> the fill to<br />

achieve the required compaction.<br />

Any surplus cut material shall be removed from site <strong>and</strong> disposed <strong>of</strong>f at a location approved by the<br />

local authority.<br />

Earth<strong>works</strong> shall be trimmed to a neat finish within the tolerance specified. The surface shall be even<br />

<strong>and</strong> con<strong>for</strong>m to the intent <strong>of</strong> the drawings.<br />

E6<br />

WATER IN EXCAVATIONS<br />

The Contractor shall at all times maintain excavations free from water regardless <strong>of</strong> source or method<br />

<strong>of</strong> entry to the excavation. The Contractor shall allow <strong>for</strong> cut-<strong>of</strong>f drains, well points, bores, drain<br />

diversions, pumps <strong>and</strong> any other means necessary to keep excavations dry <strong>and</strong> in a safe condition<br />

<strong>and</strong> shall repair or reinstate to the satisfaction <strong>of</strong> the Engineer any damage caused by failure to keep<br />

the excavation free from water.<br />

E7<br />

EXCAVATION IN ROCK<br />

The different kinds <strong>of</strong> material encountered in excavation shall be classified under the headings<br />

"Other than Rock" or "Rock", <strong>and</strong> shall have the following meanings:<br />

"Other than Rock" shall mean all kinds <strong>of</strong> materials which can be ripped by a track dozer up to<br />

100kw power <strong>and</strong> 15t mass with one tyne or broken by a track excavator up to 75kw power <strong>and</strong> 15t<br />

mass with a rock bucket.<br />

"Rock" shall mean hard material which requires ripping or breaking by a larger machine or hydraulic<br />

rock breaker <strong>and</strong> is in fact so ripped or broken.<br />

Where excavation in rock occurs, the Contractor shall be responsible <strong>for</strong> any overcut beyond that<br />

specified <strong>and</strong> all necessary backfill to allow correct line <strong>and</strong> level to be maintained.<br />

E8<br />

EXCAVATION IN EXISTING ROAD RESERVES<br />

Excavation shall be kept to a minimum in existing <strong>road</strong>ways, footpaths, other paved areas <strong>and</strong><br />

developed verges. Lawn is to be cut in sods or rolls, removed <strong>and</strong> stacked prior to excavation. Lawn<br />

is to be reinstalled <strong>and</strong> level immediately after backfill <strong>of</strong> the trenches.<br />

Any irrigation lines which are damaged during the <strong>works</strong> shall be reinstated immediately upon backfill<br />

<strong>of</strong> the excavations. Pipes shall be cut <strong>and</strong> capped to allow use <strong>of</strong> the system during <strong>works</strong>.<br />

The Contractor shall ensure minimal damage to all vegetation <strong>and</strong> any damage shall be reinstated to<br />

the satisfaction <strong>of</strong> the Engineer.<br />

E9<br />

STABILISATION<br />

The disturbed soil on the Site other than the <strong>road</strong> <strong>for</strong>mation shall be stabilised by either dry seeding<br />

<strong>and</strong> covering with shredded vegetation or hydromulch as soon as practicable after the top soil has<br />

been satisfactorily replaced <strong>and</strong> regraded.<br />

Specification <strong>for</strong> Subdivision Construction <strong>of</strong> Road Works <strong>and</strong> Drainage<br />

Rev. 1 – February 2013<br />

14

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!