specification for subdivision construction of road works and drainage
specification for subdivision construction of road works and drainage
specification for subdivision construction of road works and drainage
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Asphalt<br />
+ 5mm<br />
+ 5mm<br />
+ 100mm<br />
Surface<br />
- 0mm<br />
- 10mm<br />
- 0mm<br />
R2<br />
PAVEMENT MATERIALS<br />
R2.1 Modified Pindan<br />
This <strong>specification</strong> is <strong>for</strong> red slightly clayey or silty s<strong>and</strong> <strong>for</strong> use as a sub base course on well drained<br />
sealed <strong>road</strong>s.<br />
The material shall be extracted from an approved source <strong>and</strong> shall comply with the following criteria:<br />
PARTICLE SIZE DISTRIBUTION<br />
NOMINAL SIZE<br />
PERCENTAGE PASSING<br />
(mm)<br />
(by mass)<br />
4.75mm 100<br />
2.36mm 70 – 100<br />
1.13mm 50 – 100<br />
600Φm 36 – 100<br />
425Φm 30 – 84<br />
300Φm 25 – 71<br />
150Φm 18 – 50<br />
75Φm 13 – 35<br />
13Φm 5 – 15<br />
Dust ratio 0.2 – 0.6<br />
Liquid Limit ≤ 25<br />
Plasticity Index ≤ 10<br />
Linear Shrinkage 2-4%<br />
CBR unsoaked ≥ 60<br />
Specification <strong>for</strong> Subdivision Construction <strong>of</strong> Road Works <strong>and</strong> Drainage<br />
Rev. 1 – February 2013<br />
24