The Contractor shall instruct employees to display a co-operative <strong>and</strong> courteous manner towards the<br />

Engineer, inspecting authorities <strong>and</strong> in all contacts with the Public in respect <strong>of</strong> <strong>works</strong> carried out<br />

under the Contract. No <strong>works</strong> subject to inspection or approval shall be backfilled or rendered<br />

inaccessible until such inspection has been undertaken or approval has been given.<br />

P7<br />

SAFETY<br />

The contractor shall prepare <strong>and</strong> implement a Project Safety Management Plan which complies with<br />

the Occupational Safety <strong>and</strong> Health Act <strong>and</strong> Worksafe WA requirements.<br />

The Contractor shall notify Worksafe Western Australia <strong>of</strong> all Notifiable Works <strong>and</strong> make payment <strong>of</strong><br />

all inspection <strong>and</strong> other fees in connection with such Works.<br />

The Contractor shall conduct the <strong>construction</strong> <strong>of</strong> the Works in accordance with all current statutory<br />

requirements, Local Government By-laws <strong>and</strong> the provisions <strong>of</strong> Australian St<strong>and</strong>ard AS1470, together<br />

with any other Code relating specifically to type <strong>of</strong> machine, process, h<strong>and</strong>ling procedures or<br />

materials. The Contractor shall provide employees with all necessary equipment <strong>and</strong> protective<br />

clothing to allow the safe <strong>construction</strong> <strong>of</strong> the Works <strong>and</strong> shall ensure maintenance to all plant <strong>and</strong><br />

machinery allows <strong>for</strong> their safe operation.<br />

On notification from the Engineer in respect to any operation, machine or structure being, in the<br />

opinion <strong>of</strong> the Engineer, unsafe, the Contractor shall cease use immediately <strong>of</strong> such operation,<br />

machine or structure <strong>and</strong> shall conduct remedial work to the satisfaction <strong>of</strong> the Engineer be<strong>for</strong>e<br />

continuing to use the operation, machine or structure in the Works. Where no remedial action can<br />

ensure continued safe use <strong>of</strong> an operation, machine or structure, the Contractor shall, in the case <strong>of</strong><br />

an operation, cease such operation, <strong>and</strong>, in the case <strong>of</strong> a machine or structure, shall dismantle <strong>and</strong><br />

remove such machine or structure from the Site.<br />

Where the general safety <strong>of</strong> the Public is concerned <strong>and</strong> time <strong>of</strong> notification <strong>of</strong> the Contractor further<br />

jeopardises this safety, the Engineer may order immediate remedial <strong>works</strong> to be conducted at the<br />

Contractor's expense.<br />

The Contractor shall report all accidents <strong>and</strong> near misses to the Engineer within 24 hours in the <strong>for</strong>m<br />

<strong>of</strong> an incident report noting any corrective action undertaken or to be undertaken.<br />

The Contractor shall supply, equip <strong>and</strong> maintain adequate First Aid facilities <strong>and</strong> equipment on the<br />

site <strong>and</strong> shall have an experienced First Aid Officer available at all times when work is in progress.<br />

P8<br />

COMPACTION<br />

All fill, backfill, sub-grade or other areas required by the Specification or Drawings to be compacted<br />

shall be compacted using mechanical or other approved means to attain a minimum dry density ratio<br />

<strong>of</strong> 95% when tested in accordance with AS1289 E2.1 unless otherwise specified <strong>for</strong> the extent <strong>of</strong> the<br />

fill or 0.6m minimum depth.<br />

P9<br />

FIRE PREVENTION<br />

The Contractor shall provide <strong>and</strong> maintain adequate, approved fire fighting equipment on site. The<br />

Contractor shall observe the provisions <strong>of</strong> the WA Bushfires Act, Local Authority regulations, WA Fire<br />

Brigades Board regulations <strong>and</strong> any other regulation in respect to fire prevention.<br />

Burning shall not take place.<br />

Specification <strong>for</strong> Subdivision Construction <strong>of</strong> Road Works <strong>and</strong> Drainage<br />

Rev. 1 – February 2013<br />

4