peals, the <strong>Milton</strong> Police Department, the School Department, the Park Department,<br />
and the Cemetery Department. In February <strong>2009</strong>, Walter Heller, the Director<br />
<strong>of</strong> Public Works, resigned from his position, which would remain unfilled<br />
until July 2010. February also saw the hiring <strong>of</strong> a new employee, Civil Engineer<br />
Dale Horsman, who would work closely with Asst. <strong>Town</strong> Engineer John Thompson<br />
to help design, oversee and manage all <strong>of</strong> the Department <strong>of</strong> Public Works<br />
capital projects. In FY <strong>2009</strong>, there was over $3,000,000 in construction for capital<br />
projects ranging from watermain replacement and sewer inflow reduction<br />
to traffic signal installation and roadway improvements.<br />
WATER CAPITAL PROGRAM<br />
Engineering Design – Design for the watermain construction project<br />
planned for the spring <strong>of</strong> <strong>2009</strong> was conducted entirely by the Engineering Department.<br />
The watermain construction design included nearly $1.3M in construction,<br />
although funding would not allow for the whole project to be<br />
completed. The FY09 watermain construction contract (contract W09-1)<br />
awarded consisted <strong>of</strong> the replacement <strong>of</strong> water main on Houston Avenue (between<br />
Blue Hills Pkwy and Thacher St), Reedsdale Rd (between Randolph Ave<br />
and Pleasant St), Pleasant Street (between Reedsdale Rd and Gun Hill St.), and<br />
Horton Place. The contract also included the abandonment <strong>of</strong> a parallel unlined<br />
watermain on Pleasant Street, between Gun Hill St and Edgehill Rd. Design<br />
was completed during February <strong>2009</strong>, and bids were accepted in April<br />
<strong>2009</strong>. Tom Gioioso Construction <strong>of</strong> Rockland, MA began construction in May.<br />
Watermain relays that were designed and not included for construction were<br />
Bailey Ave, Mathaurs St, Dean Rd, Bradford Rd, Pillon Rd, and Taff Rd. These<br />
streets can now be included in future watermain construction projects as funding<br />
allows with no additional design effort required.<br />
Construction Management – During the <strong>2009</strong> fiscal year, construction on<br />
contract W08-1 was completed. This consisted <strong>of</strong> the replacement <strong>of</strong> water<br />
main on Dyer Avenue, Verndale Road, Lothrop Avenue, and Decker Street, and<br />
the abandonment <strong>of</strong> small unlined parallel mains on Houston Avenue extension<br />
and Blue Hills Parkway. Tom Gioioso Construction <strong>of</strong> Rockland, MA<br />
began construction in June <strong>of</strong> 2008 and was completed in November <strong>of</strong> 2008.<br />
SEWER CAPITAL PROGRAM<br />
The sewer master plan, better known as the Infiltration / Inflow Reduction<br />
Plan, is now in Year 5, and looking ahead to Year 6. This year, the Engineering<br />
Department, working in conjunction with Weston & Sampson Engineers,<br />
tackled the Year 5 design and prepared the contract bid documents for construction<br />
in early summer <strong>2009</strong>. Year 5 Construction and Year 6 Investigations<br />
and construction are set to take place in FY 2010.<br />
182