Engineering Design – Design was completed for the Year 5 Construction<br />
contract. This contract includes cleaning and inspection <strong>of</strong> over 45,000 linear<br />
feet <strong>of</strong> sewer pipe, topside inspection <strong>of</strong> 191 sewer manholes, testing and sealing<br />
<strong>of</strong> over 8,700 pipe joints, chemical root treatment <strong>of</strong> over 4,300 linear feet<br />
<strong>of</strong> pipe, 900 feet <strong>of</strong> cured in place sewer and sewer liners, and six open cut<br />
sewer repairs. The contract was bid and awarded in May <strong>2009</strong> to National Pipe<br />
Cleaning Company, <strong>of</strong> Watertown, CT.<br />
Construction Management – During fiscal year 2008, Year 4 construction<br />
for the Sewer I/I Reduction Plan was completed. In fiscal year <strong>2009</strong>, warranty<br />
and guarantee work was completed. Television inspection and retesting <strong>of</strong> all<br />
Year 4 repairs was completed to ensure adherence to contract specifications.<br />
This work was overseen by the Engineering Department, working in conjunction<br />
with Weston & Sampson Engineers, Inc.<br />
DRAINAGE CAPITAL PLAN<br />
The Engineering Department is currently in Year Four <strong>of</strong> its Ten Year<br />
Stormwater System capital improvement program.<br />
Engineering Design – In FY <strong>2009</strong>, the Engineering Department completed<br />
the design for Year 4 <strong>of</strong> the stormwater system rehabilitation. The year 4<br />
drainage plan consists <strong>of</strong> drain line cleaning and inspection in various sections<br />
<strong>of</strong> <strong>Milton</strong>, including Edgehill and Governor’s Rd, the Columbines including<br />
Ridge Rd, Hallen Ave and Woodside Drive, California Ave and Lochland St,<br />
and numerous other streets. Overall, approximately 30,000 linear feet <strong>of</strong> pipe<br />
is identified for cleaning and inspection, so that flow capacity can be restored.<br />
Construction Management – During fiscal year <strong>2009</strong>, the Engineering Department<br />
created construction bid documents for completion <strong>of</strong> Year 3 and Year<br />
4 <strong>of</strong> the drainage capital plan. In October 2008, a construction contract was<br />
awarded to Truax Corporation, <strong>of</strong> Lakeville, MA for over 50,000 linear feet <strong>of</strong><br />
drainage pipe rehabilitation. Construction began in the spring <strong>of</strong> <strong>2009</strong> and is<br />
expected to be wrapped up in fiscal year 2010.<br />
ROAD RESURFACING PROGRAM<br />
In FY <strong>2009</strong>, the Engineering Department completed the design for the construction<br />
<strong>of</strong> sidewalks and repaving <strong>of</strong> streets in the <strong>Town</strong> <strong>of</strong> <strong>Milton</strong>. The streets<br />
included in this year’s paving program were Dyer Avenue, Tucker Street, Aberdeen<br />
Road, Decker Street, Lothrop Avenue, Verndale Road, and Houston Avenue<br />
(between Thacher Street and Blue Hills Parkway). In addition to the road<br />
resurfacing, sidewalk and pedestrian improvements were made along all <strong>of</strong> the<br />
streets with the exception <strong>of</strong> Houston Avenue.<br />