28.10.2014 Views

City of Methuen Master Plan

City of Methuen Master Plan

City of Methuen Master Plan

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Methuen</strong> <strong>Master</strong> <strong>Plan</strong> 2007<br />

TRANSPORTATION & CIRCULATION<br />

Goal T-1: Address congestion and safety issues on arterial streets to minimize traffic diverting to local streets.<br />

TC-1.1: Continue to work with EOT to develop a plan for Route 110/113 rotary<br />

improvements that can be funded and implemented and will improve local roadway<br />

conditions.<br />

TC-1.2: Work with MassHighway and MVPC to design and implement signal and<br />

roadway improvements at Howe Street/Washington Street/Rte. 113.<br />

same as strategy 1 Ongoing<br />

same as strategy 1 2007-<br />

2008<br />

Dept. <strong>of</strong> Econ. &<br />

Comm. Dev.;<br />

Engineering Dept.<br />

Engineering Dept.<br />

TC-1.3: Conduct a city-wide traffic study to identify capacity constraints,<br />

connectivity issues, deficient signals and pavement markings, pedestrian crossing<br />

problems, issues constraining transit vehicles, and impediments to cycling.<br />

Establish a Task Force to help guide the study.<br />

• Mayor establish<br />

Task Force<br />

• Identify funding<br />

& develop RFP<br />

• Hire consultant<br />

2 2009-<br />

2010<br />

Mayor; Task Force;<br />

Engineering Dept.<br />

TC-1.4: Establish a project priority list and prepare Project Need Forms for<br />

MassHighway.<br />

:<br />

same as strategy 3 2010-<br />

2012<br />

Goal T-2: Promote an economically healthy and walkable downtown, in concert with the Downtown Development <strong>Plan</strong>.<br />

Engineering Dept.;<br />

MVPC<br />

TC-2.1: Conduct a parking study in the downtown to assess occupancy rates, by<br />

time <strong>of</strong> day, and turnover.<br />

TC-2.2: Develop effective incentives to encourage mixed-use development to have<br />

a significant number <strong>of</strong> people living in the downtown through implementation <strong>of</strong><br />

the Downtown Development <strong>Plan</strong> recommendations.<br />

• Develop work<br />

plan<br />

• Identify funding<br />

source (e.g.<br />

Chapter 43D<br />

grant)<br />

• Hire consultant<br />

or use MVPC or<br />

volunteers to<br />

conduct study<br />

3 2010-<br />

2012<br />

same as strategy 1 2007-<br />

2008<br />

Dept. <strong>of</strong> Econ. &<br />

Comm. Dev.<br />

Community<br />

Development Board;<br />

<strong>City</strong> Council<br />

TC-2.3: Revise the zoning ordinance to allow shared parking in the downtown. same as strategy 1 2007-<br />

2008<br />

Community<br />

Development Board;<br />

<strong>City</strong> Council<br />

Page 168

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!