City of Methuen Master Plan
City of Methuen Master Plan
City of Methuen Master Plan
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>Methuen</strong> <strong>Master</strong> <strong>Plan</strong> 2007<br />
recreational restrictions limiting development on them. The southern part <strong>of</strong> the neighborhood is more<br />
developed than the north, having some industry and multi-family homes. The northern part <strong>of</strong> the area<br />
is essentially exurban while the southern part is suburban.<br />
The West End<br />
The West End is bounded by New Hampshire, Dracut, the Merrimack River and the Center. It has<br />
some industrial land and moderate density residential areas just west <strong>of</strong> I-93. It also has extensive<br />
wetlands that limit development. Along the Dracut Town Line are areas <strong>of</strong> low density higher-end<br />
homes. This area is forested also. Forest Lake, an important recreational resource, is located in the<br />
northwest part <strong>of</strong> the West End, abutting the Town Forest. Most <strong>of</strong> the development in the West End<br />
is fairly recent. One area <strong>of</strong> older development is along the Merrimack River bordering Lowell<br />
Boulevard and Lowell Street. This is an area <strong>of</strong> smaller older homes mixed with roadside businesses and<br />
industry. The western half <strong>of</strong> the West End is exurban in character while the eastern half is suburban.<br />
Apart from Forest Lake, which is somewhat inaccessible, and the Hickory Hills golf course, the West<br />
End lacks recreational facilities. There is a private boat ramp on the Merrimack River, but no public<br />
parks. There are soccer fields belonging to the <strong>Methuen</strong> Soccer Association <strong>of</strong>f Hampshire Road but<br />
access to them is limited by the association. There is also an unused small ski area in the northwest<br />
corner <strong>of</strong> the West End bordering Pelham and Salem, New Hampshire, with access from Hampshire<br />
Road. The property is owned by the <strong>City</strong>.<br />
The southern part <strong>of</strong> the West End along North Lowell Street and Wheeler<br />
FUTURE<br />
Street will be subject to pressures for higher density residential development if<br />
PLANS/NEEDS: the proposed sewer service hookup with the Town <strong>of</strong> Dracut is completed.<br />
Dracut and <strong>Methuen</strong> have agreed in principle to implement this project and it is currently in negotiation.<br />
One impact <strong>of</strong> the project will be to allow higher density residential development because septic systems<br />
would no longer be needed. Currently the land in the area is zoned Agriculture-Conservation which<br />
allows residential uses and requires a minimum lot size <strong>of</strong> 80,000 sq. ft. Sewer service will accommodate<br />
smaller lots. Rezoning would have to occur to permit denser residential development. The market for<br />
housing would likely support smaller homes on smaller lots than now exist in the area. The area is a<br />
very desirable neighborhood because <strong>of</strong> the high quality <strong>of</strong> homes and open exurban character <strong>of</strong> the<br />
land. Preserving this character while allowing higher density homes would be a challenge that could be<br />
met through use <strong>of</strong> open space residential zoning and selective conservation <strong>of</strong> key open space parcels<br />
in the area. There are about 60 developed and vacant parcels <strong>of</strong> land in the area which includes 5 large<br />
parcels that could be subdivided into multiple lots. Many <strong>of</strong> the smaller parcels could also be subdivided<br />
but only into one or two additional lots. Once negotiations are completed the sewer connector to<br />
Dracut on North Lowell Street could be operating within 1 or 2 years. This project could therefore<br />
impact the area in the short term.<br />
The actively used Hickory Hills golf course is located in the area which, as noted, is currently zoned for<br />
industry. It is served by an existing sewer line in Lowell Boulevard. That line, if extended, could serve<br />
industry if it were developed on the golf course. In order to preserve the character <strong>of</strong> the area any<br />
industry would have to be carefully screened and buffered from surrounding land uses. Open campusstyle<br />
carefully landscaped and adequately buffered industrial development could be compatible with the<br />
existing character <strong>of</strong> the area.<br />
REGULATORY ANALYSIS<br />
One <strong>of</strong> the primary questions for a <strong>Master</strong> <strong>Plan</strong>ning effort is how the community’s goals, articulated in<br />
the public workshops and resulting vision statement, can be achieved through the <strong>City</strong>’s public policy.<br />
Page 22