PENRO<br />

LOCATION/<br />

PROJECT<br />

DESCRIPTION<br />

PWRS intends to rehabilitate the watershed’s vegetative cover, minimize soil<br />

erosion losses and improve the water yield and quality of the tributaries and major<br />

waterways, among which, is the Pulangui River. The river is considered one of<br />

most important resources in the province as it irrigates highly productive rice<br />

fields and generates 255 megawatts of electric power. PWRS also aims to improve<br />

ecological balance and uplift the socio-economic condition of the community.<br />

The different project components were implemented by the following:<br />

Project<br />

Component Contractor/PO <strong>Part</strong>iculars<br />

<strong>Community</strong><br />

Organizing<br />

CSD (area in<br />

hectares)<br />

Monitoring &<br />

Evaluation<br />

The Network<br />

Foundation Inc.<br />

(TNFI)<br />

Organized the following<br />

POs:<br />

• PAGTUKAS<br />

• OSA-TFAI<br />

• SAHA-TFAI<br />

Cost<br />

(in<br />

million)<br />

Status<br />

P2.099 completed<br />

Values, Inc.* OSA – TFAI<br />

SAHA - TFAI .923 terminated<br />

Blessed Phils. , CEDAMCO<br />

Inc.<br />

2.651 completed<br />

Sub-total<br />

P 5.673<br />

PAGTUKAS 1,002.00 19.929<br />

OSA 810.00 16.157<br />

SAHA 1,785.72 37.746 completed<br />

CEDAMCO 1,498.00 34.016<br />

Sub-total 5,095.72 has. 107.848<br />

LEAF Foundation Physical Validation –<br />

(LEAF)<br />

CEDAMCO<br />

1.389 completed<br />

Mindanao Physical Validation– OSA .550<br />

Integrated Physical Validation- 1.392<br />

<strong>Management</strong> SAHA<br />

Foundation Physical Validation – 1.669<br />

(MINMAF) OSA & SAHA<br />

Physical Validation (Final 1.073<br />

Pass) – OSA & SAHA<br />

Mt. Kitanglad Physical Validation -<br />

.831<br />

<strong>Community</strong> PAGTUKAS<br />

Development<br />

Foundation Inc.<br />

(MKCDFI)<br />

Institutional and Project .294<br />

Benefit-OSA,<br />

CEDAMCO,<br />

PAGTUKAS, SAHA<br />

Physical Validation –<br />

CEDAMCO &PAGTUKAS<br />

1.553<br />

Physical Validation – 1.011<br />

CEDAMCO &PAGTUKAS<br />

Sub-total P9.762<br />

Infra.<br />

Development<br />

ULTICON<br />

Builders<br />

Rehab. of 11.3 kms road<br />

and const. of 3.1 kms.<br />

concrete foot bridge<br />

34.156 completed<br />

Sub-total P34.156<br />

Total P151.39<br />

Legend:<br />

PAGTUKAS - Pagpalibud Tu Kakahuyan Asso., Inc.<br />

OSA-TFAI - Onward Savers Tree Farmers Association, Inc.<br />

SAHA-TFAI - Sail-Halapitan Tree Farmers Asso., Inc.<br />

CEDAMCO - <strong>Community</strong> Environmental Dev. & Mgt. of Concepcion Inc.<br />

* - taken over by TNFI<br />

33