PENRO<br />
LOCATION/<br />
PROJECT<br />
DESCRIPTION<br />
PWRS intends to rehabilitate the watershed’s vegetative cover, minimize soil<br />
erosion losses and improve the water yield and quality of the tributaries and major<br />
waterways, among which, is the Pulangui River. The river is considered one of<br />
most important resources in the province as it irrigates highly productive rice<br />
fields and generates 255 megawatts of electric power. PWRS also aims to improve<br />
ecological balance and uplift the socio-economic condition of the community.<br />
The different project components were implemented by the following:<br />
Project<br />
Component Contractor/PO <strong>Part</strong>iculars<br />
<strong>Community</strong><br />
Organizing<br />
CSD (area in<br />
hectares)<br />
Monitoring &<br />
Evaluation<br />
The Network<br />
Foundation Inc.<br />
(TNFI)<br />
Organized the following<br />
POs:<br />
• PAGTUKAS<br />
• OSA-TFAI<br />
• SAHA-TFAI<br />
Cost<br />
(in<br />
million)<br />
Status<br />
P2.099 completed<br />
Values, Inc.* OSA – TFAI<br />
SAHA - TFAI .923 terminated<br />
Blessed Phils. , CEDAMCO<br />
Inc.<br />
2.651 completed<br />
Sub-total<br />
P 5.673<br />
PAGTUKAS 1,002.00 19.929<br />
OSA 810.00 16.157<br />
SAHA 1,785.72 37.746 completed<br />
CEDAMCO 1,498.00 34.016<br />
Sub-total 5,095.72 has. 107.848<br />
LEAF Foundation Physical Validation –<br />
(LEAF)<br />
CEDAMCO<br />
1.389 completed<br />
Mindanao Physical Validation– OSA .550<br />
Integrated Physical Validation- 1.392<br />
<strong>Management</strong> SAHA<br />
Foundation Physical Validation – 1.669<br />
(MINMAF) OSA & SAHA<br />
Physical Validation (Final 1.073<br />
Pass) – OSA & SAHA<br />
Mt. Kitanglad Physical Validation -<br />
.831<br />
<strong>Community</strong> PAGTUKAS<br />
Development<br />
Foundation Inc.<br />
(MKCDFI)<br />
Institutional and Project .294<br />
Benefit-OSA,<br />
CEDAMCO,<br />
PAGTUKAS, SAHA<br />
Physical Validation –<br />
CEDAMCO &PAGTUKAS<br />
1.553<br />
Physical Validation – 1.011<br />
CEDAMCO &PAGTUKAS<br />
Sub-total P9.762<br />
Infra.<br />
Development<br />
ULTICON<br />
Builders<br />
Rehab. of 11.3 kms road<br />
and const. of 3.1 kms.<br />
concrete foot bridge<br />
34.156 completed<br />
Sub-total P34.156<br />
Total P151.39<br />
Legend:<br />
PAGTUKAS - Pagpalibud Tu Kakahuyan Asso., Inc.<br />
OSA-TFAI - Onward Savers Tree Farmers Association, Inc.<br />
SAHA-TFAI - Sail-Halapitan Tree Farmers Asso., Inc.<br />
CEDAMCO - <strong>Community</strong> Environmental Dev. & Mgt. of Concepcion Inc.<br />
* - taken over by TNFI<br />
33