SOUND IMPLEMENTATION AND MAINTENANCE STRATEGIES/ACTIVITIES<br />

a series of dialogue and that the areas were found suitable for planting<br />

based on the assessment of the RO – Research and Development<br />

Section (RDS). A copy of assessment report could not be furnished to<br />

the team.<br />

The identified replacement/expansion area included 296.30 hectares<br />

located within the <strong>Community</strong> <strong>Based</strong> Resource <strong>Management</strong> <strong>Program</strong><br />

(CBRMP) implemented by the Local Government of Palompon, Leyte<br />

and 250 hectares located in Brgys. Cantuhaon and Duljugan.<br />

As reported in the Monitoring and Evaluation Report, the project<br />

attained a survival rate of 82.78% for the original area and 83.43% for<br />

the replacement area or an overall average of 82.77%. These<br />

accomplishments were within the acceptable level of 80% survival rate.<br />

As of February 17, 2006, however, the PO and the SUSIMO estimated<br />

that the survival rate went down to about 62% from 82.77% weighted<br />

average survival rate (WASR) attained upon project completion. The<br />

survival rate was computed as follows:<br />

Ref. No.<br />

per Map<br />

Location Per Brgy<br />

Boundaries<br />

No. of Hectares<br />

Planted <strong>Based</strong> on<br />

Progress Map of the<br />

SUSIMO<br />

Est. Number of<br />

Hectares Survived<br />

based On<br />

PO/SUSIMO’s Ocular<br />

Inspection<br />

Survival<br />

Rate (%)<br />

1 Cantandoy to Cambinoy 76.20 3 3.94<br />

2 Cambinoy to Cangcosme 350.10 163 46.56<br />

3 Cangcosme to Parilla 270.78 186 68.70<br />

4 Parilla to Cruz 255.30 180 70.50<br />

5 Cruz to Plaridel 272.78 248 90.91<br />

6 Plaridel to Duljugan 171.14 84 49.10<br />

Average Survival<br />

Rate 1,396.30 864 61.88<br />

The team observed the conduct of project assessment by the PO and<br />

the SUSIMO and noted that the reported survival rate of 49% within<br />

the stretch of Plaridel and Duljugan may not be considered realistic.<br />

The team’s assessment of survival rate within this stretch was only<br />

between 5-10%. Still, the Regional Office questioned the reported<br />

survival rate of about 62% adopted by the PO and SUSIMO.<br />

This is an indication that the identified areas were not suitable for<br />

replanting/reforestation. This view was shared by the PO itself, who<br />

claimed that the areas were not suitable for planting/reforestation due<br />

to the following:<br />

58

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!