SOUND IMPLEMENTATION AND MAINTENANCE STRATEGIES/ACTIVITIES<br />
a series of dialogue and that the areas were found suitable for planting<br />
based on the assessment of the RO – Research and Development<br />
Section (RDS). A copy of assessment report could not be furnished to<br />
the team.<br />
The identified replacement/expansion area included 296.30 hectares<br />
located within the <strong>Community</strong> <strong>Based</strong> Resource <strong>Management</strong> <strong>Program</strong><br />
(CBRMP) implemented by the Local Government of Palompon, Leyte<br />
and 250 hectares located in Brgys. Cantuhaon and Duljugan.<br />
As reported in the Monitoring and Evaluation Report, the project<br />
attained a survival rate of 82.78% for the original area and 83.43% for<br />
the replacement area or an overall average of 82.77%. These<br />
accomplishments were within the acceptable level of 80% survival rate.<br />
As of February 17, 2006, however, the PO and the SUSIMO estimated<br />
that the survival rate went down to about 62% from 82.77% weighted<br />
average survival rate (WASR) attained upon project completion. The<br />
survival rate was computed as follows:<br />
Ref. No.<br />
per Map<br />
Location Per Brgy<br />
Boundaries<br />
No. of Hectares<br />
Planted <strong>Based</strong> on<br />
Progress Map of the<br />
SUSIMO<br />
Est. Number of<br />
Hectares Survived<br />
based On<br />
PO/SUSIMO’s Ocular<br />
Inspection<br />
Survival<br />
Rate (%)<br />
1 Cantandoy to Cambinoy 76.20 3 3.94<br />
2 Cambinoy to Cangcosme 350.10 163 46.56<br />
3 Cangcosme to Parilla 270.78 186 68.70<br />
4 Parilla to Cruz 255.30 180 70.50<br />
5 Cruz to Plaridel 272.78 248 90.91<br />
6 Plaridel to Duljugan 171.14 84 49.10<br />
Average Survival<br />
Rate 1,396.30 864 61.88<br />
The team observed the conduct of project assessment by the PO and<br />
the SUSIMO and noted that the reported survival rate of 49% within<br />
the stretch of Plaridel and Duljugan may not be considered realistic.<br />
The team’s assessment of survival rate within this stretch was only<br />
between 5-10%. Still, the Regional Office questioned the reported<br />
survival rate of about 62% adopted by the PO and SUSIMO.<br />
This is an indication that the identified areas were not suitable for<br />
replanting/reforestation. This view was shared by the PO itself, who<br />
claimed that the areas were not suitable for planting/reforestation due<br />
to the following:<br />