Comprehensive Fees and Charges Bylaw - City of Prince George
Comprehensive Fees and Charges Bylaw - City of Prince George
Comprehensive Fees and Charges Bylaw - City of Prince George
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
CPG <strong>Comprehensive</strong> <strong>Fees</strong> & <strong>Charges</strong> <strong>Bylaw</strong> No. 7557, 2004 Page 5<br />
Plumbing Permit <strong>Fees</strong><br />
Minimum processing fee for all applications (Nonrefundable)<br />
$70.00<br />
For the installation, alteration, or repair <strong>of</strong> a building<br />
sewer, storm building sewer, <strong>and</strong>/or water service<br />
pipe.<br />
For the installation, alteration, or repair <strong>of</strong> a plumbing<br />
system.<br />
$70.00<br />
$70.00 plus $8.00 for each<br />
plumbing fixture.<br />
Moving Permit $75.00<br />
Demolition Permit $75.00<br />
Street Occupancy Permit<br />
Street Occupancy Permit fee for the occupancy <strong>of</strong> a<br />
street or the airspace above a street.<br />
Re-inspection Fee<br />
Where it has been determined by the Building<br />
Inspector that due to non-compliance with the<br />
provisions <strong>of</strong> this <strong>Bylaw</strong> or due to unsatisfactory<br />
workmanship, the fee for each inspection shall be:<br />
$10.00 per day or $.05 per<br />
square meter per day, whichever<br />
is greater.<br />
$75.00<br />
Permit Transfer or Assignment Fee<br />
For the transfer or assignment <strong>of</strong> a Building Permit or<br />
an application for a Building Permit, when requested<br />
in writing by the applicant pursuant to Subsection<br />
4.6(c) <strong>and</strong> 5.5(c) <strong>of</strong> the “<strong>City</strong> <strong>of</strong> <strong>Prince</strong> <strong>George</strong><br />
Building <strong>Bylaw</strong> No. 5912, 1993”, an additional fee<br />
shall be paid <strong>of</strong> ten percent (10%) <strong>of</strong> the original<br />
permit fee or $35.00, whichever is the greater.<br />
Permit Extension Fee<br />
For the extension <strong>of</strong> a Building Permit when<br />
requested in writing by the applicant pursuant to