23.11.2014 Views

RT120Q Operator's Manual - Ditch Witch

RT120Q Operator's Manual - Ditch Witch

RT120Q Operator's Manual - Ditch Witch

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Service - 158<br />

Trencher<br />

<strong>RT120Q</strong> Operator’s <strong>Manual</strong><br />

10 Hour<br />

Lube Trencher Tail Roller<br />

Wipe zerks clean and lube every 10 hours with<br />

EPG. Lube roller zerks on both sides of boom.<br />

Lube Trencher Pivot<br />

Wipe five zerks located on right of trencher pivot<br />

clean and lube every 10 hours with EPG.<br />

Wipe four zerks located on left of trencher pivot<br />

clean and lube every 10 hours with EPG.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!