RT120Q Operator's Manual - Ditch Witch
RT120Q Operator's Manual - Ditch Witch
RT120Q Operator's Manual - Ditch Witch
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>RT120Q</strong> Operator’s <strong>Manual</strong> Operation Overview - 67<br />
Digging with Backhoe<br />
4. Begin drilling. See page 125.<br />
5. Use drill string guide as needed. See page 126.<br />
6. Add rod. See page 127.<br />
7. Backream. See page 127.<br />
8. Shut down tractor. See page 80.<br />
9. Disassemble joints. See page 128.<br />
Digging with Backhoe<br />
1. Start unit. See page 76.<br />
2. Set stabilizers and unstow backhoe. See page 116.<br />
3. Excavate. See page 117.<br />
4. Stow backhoe properly. See page 118.<br />
5. Shut down tractor. See page 80.<br />
Sawing<br />
1. Start unit. See page 76.<br />
2. Position tractor and controls. See page 130.<br />
3. Begin sawing. See page 132.<br />
4. Complete the installation. See page 134.<br />
5. Backfill the trench. See page 144.<br />
6. Shut down tractor. See page 80.<br />
Leaving Jobsite<br />
1. Backfill if necessary. See page 144.<br />
2. Rinse equipment. See page 144.<br />
3. Stow tools. See page 144.<br />
4. Haul equipment from jobsite. See page 88.<br />
CMW