<strong>RT120Q</strong> Operator’s <strong>Manual</strong> Operation Overview - 67<br />

Digging with Backhoe<br />

4. Begin drilling. See page 125.<br />

5. Use drill string guide as needed. See page 126.<br />

6. Add rod. See page 127.<br />

7. Backream. See page 127.<br />

8. Shut down tractor. See page 80.<br />

9. Disassemble joints. See page 128.<br />

Digging with Backhoe<br />

1. Start unit. See page 76.<br />

2. Set stabilizers and unstow backhoe. See page 116.<br />

3. Excavate. See page 117.<br />

4. Stow backhoe properly. See page 118.<br />

5. Shut down tractor. See page 80.<br />

Sawing<br />

1. Start unit. See page 76.<br />

2. Position tractor and controls. See page 130.<br />

3. Begin sawing. See page 132.<br />

4. Complete the installation. See page 134.<br />

5. Backfill the trench. See page 144.<br />

6. Shut down tractor. See page 80.<br />

Leaving Jobsite<br />

1. Backfill if necessary. See page 144.<br />

2. Rinse equipment. See page 144.<br />

3. Stow tools. See page 144.<br />

4. Haul equipment from jobsite. See page 88.<br />