23.11.2014 Views

RT120Q Operator's Manual - Ditch Witch

RT120Q Operator's Manual - Ditch Witch

RT120Q Operator's Manual - Ditch Witch

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Drive - 80<br />

Shut Down<br />

<strong>RT120Q</strong> Operator’s <strong>Manual</strong><br />

Shut Down<br />

1. When job is complete, move ground drive control to neutral.<br />

2. Engage parking brake and verify parking brake indicator is on.<br />

3. Lower all attachments to ground and let machine idle for three minutes to cool.<br />

4. Turn ignition switch to STOP. If leaving machine unattended, remove key.<br />

5. For maintenance or long-term storage, turn battery disconnect switch to disconnect position.<br />

CMW

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!