23.11.2014 Views

RT120Q Operator's Manual - Ditch Witch

RT120Q Operator's Manual - Ditch Witch

RT120Q Operator's Manual - Ditch Witch

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>RT120Q</strong> Operator’s <strong>Manual</strong> Service - 175<br />

500 Hour<br />

Plow<br />

Change Plow Vibrator Oil<br />

Hot parts may<br />

cause burns. Do not touch until<br />

cool.<br />

Change plow vibrator oil every 500 hours. If<br />

normal operating temperature exceeds 100°F<br />

(38°C), change plow vibrator oil every 250 hours.<br />

Drain oil at drain plug (2). Replace plug and<br />

move plow vibrator to horizontal position. Add<br />

MPL at fill until oil is halfway up sight glass (1).<br />

Refill capacity is 4 qts (3.8 L).<br />

Trencher<br />

Adjust Headshaft Bearing<br />

Adjust headshaft bearing every 500 hours.<br />

To adjust:<br />

1. Remove cover. Remove bolts attaching<br />

trenching attachment motor to gearbox.<br />

2. Remove bolt and washers in left end of<br />

headshaft.<br />

3. Support gearbox with hoist and slide it off<br />

headshaft.<br />

4. Install spacer (p/n 184-044) in place of<br />

gearbox while checking bearings.<br />

5. Replace bolt on end of headshaft.<br />

6. Remove chain from headshaft sprocket.<br />

7. Turn chain sprocket until headshaft sprocket turns. When properly adjusted, it will take two hands and<br />

some effort. If it turns easily, remove a shim.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!