23.11.2014 Views

RT120Q Operator's Manual - Ditch Witch

RT120Q Operator's Manual - Ditch Witch

RT120Q Operator's Manual - Ditch Witch

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Service - 182<br />

Trencher<br />

<strong>RT120Q</strong> Operator’s <strong>Manual</strong><br />

As Needed<br />

Replace Digging Chain<br />

Visually check digging chains for wear on teeth<br />

(1), rollers, and sidebars (2). Check pins (3) and<br />

bushing wear by measuring distance between<br />

chain pins and comparing it with a new chain.<br />

IMPORTANT: Replace sprockets when a new<br />

chain is installed.<br />

To remove chain:<br />

1. Fasten and adjust seat belt.<br />

2. Start tractor. See page 76 for proper start-up<br />

procedures.<br />

3. Move attachment direction/speed control<br />

until digging chain connector pin is on top of boom.<br />

4. Lower boom to ground.<br />

5. Engage parking brake and verify parking brake indicator is on.<br />

6. Turn ignition switch to STOP.<br />

7. Secure chain by clamping links on either side<br />

of connector pin with chain jaws. Squeeze<br />

jaws to reduce pressure on connector pin.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!