Operation Overview - 66<br />
Planning<br />
<strong>RT120Q</strong> Operator’s <strong>Manual</strong><br />
Planning<br />
1. Gather information about jobsite. See page 70.<br />
2. Inspect jobsite. See page 71.<br />
3. Classify jobsite. See page 72.<br />
4. Select chain and teeth to match your soil type, if necessary. See page 140<br />
5. Check supplies and prepare equipment. See page 74.<br />
6. Haul equipment to jobsite. See page 88.<br />
Trenching<br />
1. Start unit. See page 76.<br />
2. Position tractor and controls. See page 94.<br />
3. Begin trenching. See page 96.<br />
4. Engage cruise control if desired. See page 138.<br />
5. Complete the installation. See page 99.<br />
6. Shut down tractor. See page 80.<br />
Plowing<br />
1. Start unit. See page 76.<br />
2. Position tractor and controls. See page 102.<br />
• offset plowing - page 109<br />
• coordinated plowing - page 109<br />
• crabbing - page 109<br />
3. Attach product. See page 103.<br />
4. Begin plowing. See page 105.<br />
5. Engage cruise control if desired. See page 138.<br />
6. Complete the installation. See page 108.<br />
7. Shut down tractor. See page 80.<br />
Drilling<br />
1. Start unit. See page 76.<br />
2. Dig approach trench and target trench. See page 123.<br />
3. Assemble drill string and position tractor. See page 124.<br />
CMW