Operation Overview - 66<br />

Planning<br />

<strong>RT120Q</strong> Operator’s <strong>Manual</strong><br />

Planning<br />

1. Gather information about jobsite. See page 70.<br />

2. Inspect jobsite. See page 71.<br />

3. Classify jobsite. See page 72.<br />

4. Select chain and teeth to match your soil type, if necessary. See page 140<br />

5. Check supplies and prepare equipment. See page 74.<br />

6. Haul equipment to jobsite. See page 88.<br />

Trenching<br />

1. Start unit. See page 76.<br />

2. Position tractor and controls. See page 94.<br />

3. Begin trenching. See page 96.<br />

4. Engage cruise control if desired. See page 138.<br />

5. Complete the installation. See page 99.<br />

6. Shut down tractor. See page 80.<br />

Plowing<br />

1. Start unit. See page 76.<br />

2. Position tractor and controls. See page 102.<br />

• offset plowing - page 109<br />

• coordinated plowing - page 109<br />

• crabbing - page 109<br />

3. Attach product. See page 103.<br />

4. Begin plowing. See page 105.<br />

5. Engage cruise control if desired. See page 138.<br />

6. Complete the installation. See page 108.<br />

7. Shut down tractor. See page 80.<br />

Drilling<br />

1. Start unit. See page 76.<br />

2. Dig approach trench and target trench. See page 123.<br />

3. Assemble drill string and position tractor. See page 124.<br />