23.11.2014 Views

RT120Q Operator's Manual - Ditch Witch

RT120Q Operator's Manual - Ditch Witch

RT120Q Operator's Manual - Ditch Witch

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Service - 184<br />

<strong>RT120Q</strong> Operator’s <strong>Manual</strong><br />

As Needed<br />

To install chain:<br />

1. Lay chain on ground with teeth down and pointed toward unit.<br />

2. Fasten and adjust seat belt.<br />

3. Start tractor. See page 76 for start-up procedures.<br />

4. Disengage parking brake and verify parking brake indicator is off.<br />

5. Move ground drive control to reverse.<br />

6. Back unit up until chain extends past head shaft about 1’ (305 mm).<br />

7. Move ground drive control to neutral.<br />

8. Lower backfill blade, if equipped, to ground.<br />

9. Lower boom to horizontal position.<br />

10. Engage parking brake and verify parking brake indicator is on.<br />

11. Turn ignition switch to STOP.<br />

12. Pull rear end of chain over and about 10" (260 mm) past tail roller.<br />

13. Use hoist to pull front end of chain over head shaft sprocket.<br />

14. Move chain down boom until chain connector pin and lock key can be installed. Install connector pin<br />

and lock key.<br />

15. Tighten chain by pumping EPG into grease cylinder.<br />

Time Augers<br />

Ensure that augers are balanced, as shown. If<br />

auger timing is off, unit will bounce from side to<br />

side even in normal digging conditions.<br />

To adjust timing:<br />

1. Remove bolts holding augers to auger shaft<br />

and rotate either auger as needed until<br />

augers are balanced.<br />

2. Reinstall bolts and tighten securely.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!