Item No 10.3<br />
Report Title<br />
<strong>Council</strong> Meeting Date 10 July 2013<br />
Author<br />
Title<br />
Department<br />
Attachments<br />
File Ref - Records<br />
Penneshaw CWMS Update<br />
Andrew C Boardman<br />
Chief Executive Officer<br />
CEO<br />
Appendix 1 – Public Consultation Plan<br />
Nil<br />
Hours to compile 15.0<br />
Strategic Plan<br />
Reference<br />
Purpose<br />
Executive Summary<br />
Recommendation<br />
4.85 – Undertake the construction of the Penneshaw CWMS<br />
subject to final financing consideration<br />
To update <strong>Council</strong> on a further clarification from the LGA CWMS<br />
Committee with regards to the likely subsidy that could apply to<br />
the Penneshaw CWMS Scheme as currently specified and to<br />
advise <strong>Council</strong> of the options, costs and recommended solution<br />
to go to public consultation.<br />
The scheme for the whole of Penneshaw is simply expensive in<br />
relation to the number of potential connections. The CWMS<br />
Committee recognise and acknowledge the need for the<br />
Scheme but feel that they are unable to fund the proposal for<br />
the whole of the town as proposed by <strong>Council</strong>. They have made<br />
an alternate offer of funding for an area comprising the CBD /<br />
Levels / Christmas Cove as far as the School and a treatment<br />
facility / treated effluent storage lagoon in a central location. The<br />
location of the treatment plant and storage lagoon in this<br />
proposal allows no option for growth outside of the prescribed<br />
areas and may leave future <strong>Council</strong>s with a significant cost<br />
issue (that may not attract subsidy) to further extend the<br />
scheme. The various options have been considered by<br />
Administration and a recommendation is presented for <strong>Council</strong><br />
to consider and determine whether to proceed to public<br />
consultation or otherwise.<br />
That <strong>Council</strong> resolves:<br />
1) To adopt for public consultation Penneshaw CWMS<br />
Design Option 3. This comprises a collection network<br />
encompassing the areas known as the CBD & Levels<br />
and incorporating linear development either side of the<br />
Hog Bay Road as far west as Penneshaw Community<br />
School with the wastewater treatment plant and treated<br />
effluent storage lagoon being sited on land on the<br />
hillside to the south of The Lane and to the west of<br />
Cheopis Street.<br />
2) That the following will apply to the completed scheme:<br />
a. Standard greenfield (new) development 100mm<br />
connection cost – no current infrastructure -<br />
$6,648.50 inclusive of application fee and<br />
applicable GST<br />
b. Standard 100mm Connection cost replacing an<br />
existing septic tank (applying current rebate of<br />
$1,500) - $ 5,148.50 inclusive of application fee<br />
and applicable GST<br />
<strong>Kangaroo</strong> <strong>Island</strong> <strong>Council</strong> – 10 July 2013 <strong>Agenda</strong> 15