Appeals<br />

7. Update on developments with outstanding appeals at the time of writing:<br />

Land Division Hd. Haines (1 lot into 2) is adjourned until 19 August 2013<br />

pending DAC Concurrence. Should DAC concur with approval of the new<br />

application for this development, the appeal is likely to be resolved and<br />

further appearances vacated.<br />

<br />

Appeal relating to illegal development within Vivonne Bay (Harriet Township)<br />

remains adjourned until 5 August 2013, with liberty to apply, pending<br />

finalising of Development Assessment processes, based on <strong>SA</strong> Dept of<br />

Health approval for an alternative wastewater treatment system.<br />

<strong>Council</strong> is advised that the applicant has lodged the formal application with<br />

<strong>SA</strong> Department of Health for an alternative waste control system (outside of<br />

<strong>Council</strong> <strong>au</strong>thority to approve), for which we are awaiting the approval.<br />

<br />

Brian Johnston / Sealink passenger terminal project – remains adjourned until<br />

4 July 2013, when a scheduled conference may resume to track progress<br />

with amendment applications and consents.<br />

Stage 1 and 1A consents have been issued for concrete pier and pad<br />

footings only. The stop work order continues to operate beyond the<br />

completion of these items. <strong>Council</strong> has not sought to adjourn the scheduled<br />

conference at this time.<br />

Further amended designs are still required for assessment of a proposed<br />

Stage 2 which will detail the amended concrete beams and slabs intended to<br />

be used, and Stage 3 detailing the remainder of the superstructure of the<br />

building.<br />

Compliance (Strategic Plan – Item 2.9-2.10)<br />

8. <strong>Council</strong>’s Building Fire Safety Committee met on 31 May 2013 – Next meeting of the<br />

committee will occur towards the end of the year (October / November likely) TBA.<br />

9. Building inspections – carried out in accordance with <strong>Council</strong> Policy & Development<br />

Act 1993 / Regulations 2008.<br />

Projects and general matters (Strategic Plan – Item 2.1, 2.2 and 2.11)<br />

10. Visible Solar project<br />

12. Lot 4 B<strong>au</strong>din Beach – DAC decision pending<br />

13. Western River Cove ‘Land Swap’ – boundary realignment proposal received DAC<br />

concurrence and is proceeding through post approval processes including the<br />

associated roads closing and transfer processes.<br />

<strong>Kangaroo</strong> <strong>Island</strong> <strong>Council</strong> – 10 July 2013 <strong>Agenda</strong> 66