Appeals<br />
7. Update on developments with outstanding appeals at the time of writing:<br />
Land Division Hd. Haines (1 lot into 2) is adjourned until 19 August 2013<br />
pending DAC Concurrence. Should DAC concur with approval of the new<br />
application for this development, the appeal is likely to be resolved and<br />
further appearances vacated.<br />
<br />
Appeal relating to illegal development within Vivonne Bay (Harriet Township)<br />
remains adjourned until 5 August 2013, with liberty to apply, pending<br />
finalising of Development Assessment processes, based on <strong>SA</strong> Dept of<br />
Health approval for an alternative wastewater treatment system.<br />
<strong>Council</strong> is advised that the applicant has lodged the formal application with<br />
<strong>SA</strong> Department of Health for an alternative waste control system (outside of<br />
<strong>Council</strong> <strong>au</strong>thority to approve), for which we are awaiting the approval.<br />
<br />
Brian Johnston / Sealink passenger terminal project – remains adjourned until<br />
4 July 2013, when a scheduled conference may resume to track progress<br />
with amendment applications and consents.<br />
Stage 1 and 1A consents have been issued for concrete pier and pad<br />
footings only. The stop work order continues to operate beyond the<br />
completion of these items. <strong>Council</strong> has not sought to adjourn the scheduled<br />
conference at this time.<br />
Further amended designs are still required for assessment of a proposed<br />
Stage 2 which will detail the amended concrete beams and slabs intended to<br />
be used, and Stage 3 detailing the remainder of the superstructure of the<br />
building.<br />
Compliance (Strategic Plan – Item 2.9-2.10)<br />
8. <strong>Council</strong>’s Building Fire Safety Committee met on 31 May 2013 – Next meeting of the<br />
committee will occur towards the end of the year (October / November likely) TBA.<br />
9. Building inspections – carried out in accordance with <strong>Council</strong> Policy & Development<br />
Act 1993 / Regulations 2008.<br />
Projects and general matters (Strategic Plan – Item 2.1, 2.2 and 2.11)<br />
10. Visible Solar project<br />
12. Lot 4 B<strong>au</strong>din Beach – DAC decision pending<br />
13. Western River Cove ‘Land Swap’ – boundary realignment proposal received DAC<br />
concurrence and is proceeding through post approval processes including the<br />
associated roads closing and transfer processes.<br />