16.01.2015 Views

Biosafety Guidelines For Research On Genetically Modified ...

Biosafety Guidelines For Research On Genetically Modified ...

Biosafety Guidelines For Research On Genetically Modified ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

SECTION 3: SUMMARY OF PROCEDURES<br />

3.1 DECISION FLOW CHART FOR ASSESSMENT AND NOTIFICATION OF<br />

RESEARCH WORK<br />

The relevant procedures for assessment and notification of research work<br />

involving genetic manipulation are detailed in Sections 3.3 – 3.6. A simplified<br />

Decision Chart is shown below for easy referral.<br />

Does the work fall within the extent of the GMAC <strong>Guidelines</strong><br />

(see Section 2.1)<br />

Yes No Don’t know<br />

No action required<br />

Consult IBC for advice<br />

Is the work exempt from the <strong>Guidelines</strong> under Sections 2.2.1<br />

(i.e Category C)<br />

No<br />

Yes<br />

No action required<br />

Don’t know<br />

Consult IBC for advice<br />

Principal Investigator (PI)<br />

Submit ‘Proposal <strong>For</strong>m for Assessment of Genetic Modification Work’ to the IBC.<br />

The template Proposal <strong>For</strong>m and instructions for completing the form can be found<br />

in the GMAC <strong>Biosafety</strong> <strong>Guidelines</strong> for <strong>Research</strong>, Appendix 3.<br />

Reject or Request for<br />

more information<br />

IBC<br />

Assess the proposal<br />

IBC Approval<br />

Category A<br />

IBC<br />

Notify GMAC of decision. <strong>For</strong>ward a copy of<br />

duly-signed proposal form and relevant<br />

documents to GMAC.<br />

GMAC<br />

Review proposal and forward<br />

comments/recommendations to IBC and (if<br />

necessary) to regulatory authorities.<br />

PI<br />

DO NOT commence work UNTIL IBC<br />

approval AND GMAC acknowledgement of<br />

notification is received.<br />

Category B<br />

IBC<br />

Inform GMAC of decision. <strong>For</strong>ward a copy of<br />

duly-signed proposal form and relevant<br />

documents.<br />

GMAC<br />

GMAC will normally not advise IBC on<br />

Category B proposals.<br />

PI<br />

DO NOT commence work UNTIL IBC gives<br />

approval.<br />

Page 6

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!