19.01.2015 Views

The Lewis River Hydroelectric Projects - PacifiCorp

The Lewis River Hydroelectric Projects - PacifiCorp

The Lewis River Hydroelectric Projects - PacifiCorp

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Lewis</strong> <strong>River</strong> Interpretive & Education Plan<br />

At all the sites, the interpretive program is intended to be a self-guided<br />

experience. <strong>The</strong> self-guided nature of the site, however, will not preclude guided<br />

tours, presentations, or “campfire” programs conducted by volunteers.<br />

Vandalism and Maintenance<br />

Irrespective of the setting, vandalism is a fact of life—any public display will<br />

eventually face the onslaught of graffiti, destruction, or simple deterioration over<br />

time. In an attempt to minimize the opportunities for vandalism, the location,<br />

placement, and materials recommended for this project are intended to mitigate<br />

damage.<br />

Sea Reach Ltd • 146 NE yamhill Street • Sheridan, OR draft 3 • November 2008 • page 5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!