19.01.2015 Views

The Lewis River Hydroelectric Projects - PacifiCorp

The Lewis River Hydroelectric Projects - PacifiCorp

The Lewis River Hydroelectric Projects - PacifiCorp

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

• Flood management needs –<strong>PacifiCorp</strong> must maintain “storage”, or<br />

reserve space, in the reservoirs to buffer high input or runoff during<br />

the winter.<br />

• Maintenance needs –<strong>The</strong> company must take into account regular and<br />

unscheduled maintenance needs in planning water releases.<br />

In addition to all these parameters, <strong>PacifiCorp</strong> water managers must also<br />

factor in the future, including weather forecasts and energy cost estimates<br />

to create daily water release schedules. <strong>The</strong>se provide hour-by-hour plans<br />

for operation of the river system and generation.<br />

Images:<br />

Diagram of the three reservoirs, showing how levels might fluctuate over<br />

the course of a day, week, season. Photos of dam operations. Icons<br />

representing bullet points.<br />

Appendix 1: panel profiles <strong>Lewis</strong> <strong>River</strong> Draft I&E Plan page 49

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!