<strong>Lewis</strong> <strong>River</strong> Interpretive & Education Plan<br />

capacity is approximately 385,000 acre-feet, almost 131 billion gallons.<br />

<strong>The</strong> Yale Project’s average annual generation is 560,398 Mwh, enough to power<br />

over 73,700 homes.<br />

Swift Project No. 1<br />

<strong>The</strong> Swift Project No.1 (Swift Dam and reservoir) are the farthest-upstream of<br />

the <strong>Lewis</strong> <strong>River</strong> hydroelectric projects. Construction of the dam began in 1956<br />

and was completed by 1958.<br />

<strong>The</strong> dam and lake are named for nearby Swift Creek, which enters Swift Lake<br />

just above the dam.<br />

<strong>The</strong> Swift Dam is yet another type of dam—an earthfill dam (when constructed,<br />

Swift Dam was the tallest earthfill dam in the world, it is currently the 3rd<br />

tallest). Its maximum height above its foundation is 512 feet, and it is 2100<br />

feet long. Swift Lake is approximately 11.5 miles long with a surface area<br />

of approximately 4,680 acres at full pool. Its maximum storage capacity is<br />

approximately 692,000 acre-feet, or over 246 billion gallons. Swift Project No.1’s<br />

average annual generation is 677,555 Mwh, enough to power over 89,100 homes.<br />

Swift Project No. 2<br />

Swift Project No. 2 (owned by Cowlitz County PUD and operated under<br />

contract by <strong>PacifiCorp</strong>) was built concurrently with Swift Project No. 1. It is not<br />

a dam/reservoir system but a 3.2-mile canal. Tailrace water from the Swift Dam<br />

enters the canal at the Swift No. 1 Powerhouse. <strong>The</strong> water travels via the canal to<br />

the Swift No. 2 powerhouse, located just above Yale Lake. Swift Project <strong>The</strong> canal<br />

surface area is approximately 100 acres, and it holds approximately 2,400 acrefeet<br />

(782 million gallons) of water. No.2’s average annual generation is 277,750<br />

Mwh, enough to power over 36,500 homes.<br />

Types of Dams<br />

A dam is fundamentally just a very heavy mass, placed in a waterway to keep<br />

the water from flowing. Dams store water for many different purposes: power<br />

generation, agriculture, municipal water supplies, etc. To some extent, a dam’s<br />

construction is a reflection of its purpose, but to a greater extent it depends on<br />

the site, the conditions, and the materials available. <strong>The</strong> hydroelectric projects<br />

here on the <strong>Lewis</strong> <strong>River</strong> represent two primary types of dams: concrete arch and<br />

embankment dams.<br />

Concrete arch dam<br />

Concrete arch dams are constructed where bedrock abutments provide solid<br />

foundations between which the dam can be built—usually in narrow canyons.<br />

<strong>The</strong>ir distinctive arch/wedge shape is dictated by the properties of concrete,<br />

a material with very high compression strength but low tensile strength<br />

Sea Reach Ltd • 146 NE yamhill Street • Sheridan, OR draft 3 • November 2008 • page 69