Referral to the Commonwealth Minister for Sustainability, Environment, Water, Population and<br />

Communities for further consideration or approval in relation to potential flora and fauna impacts<br />

associated with the proposal is not considered necessary.<br />

Civil Aviation (Building Control) Regulation 1988<br />

The regulation controls site and height <strong>of</strong> buildings that may affect flights. Buildings must not<br />

penetrate any obstacle limitation surface shown on any relevant Obstacle Surface Plan that has<br />

been prepared by a potentially affected airport or aerodrome. If a building is within the obstacle<br />

limitations, an approval from Civil Aviation Safety Authority <strong>of</strong> Australia (CASAA) must be<br />

obtained.<br />

The proposed site is outside the restriction zones <strong>of</strong> Mascot Airport and provisions <strong>of</strong> the<br />

regulation do not apply.<br />

2.7 Ecological Sustainable Development<br />

Ecologically sustainable development (ESD) entails using, conserving and enhancing the<br />

community’s environmental resources in a manner that sustains and improves ecological<br />

processes and, hence, the quality <strong>of</strong> life, for present and future generations. The basis for<br />

achieving ecologically sustainable development involves the application <strong>of</strong> four principles:<br />

• the precautionary principle;<br />

• intra and inter-generational equity;<br />

• conservation <strong>of</strong> biological diversity and ecological integrity; and<br />

• improved valuation and pricing <strong>of</strong> environmental resources.<br />

RailCorp is committed to ensuring its projects are consistent with the principles <strong>of</strong> ESD and the<br />

principles <strong>of</strong> ESD have been considered for this proposal (refer Table 1).<br />

Table 1<br />

Consideration <strong>of</strong> ESD for the proposal<br />

ESD Principle<br />

Precautionary principle<br />

Application to the proposal<br />

The site selection and design process aims to avoid areas where<br />

there will be a significant environmental impact or impacts that are<br />

irreversible. The site selected is within a previously disturbed area<br />

in the rail corridor. In addition, some <strong>of</strong> the potential impacts are<br />

reversible as the monopole and cabinets can be removed, if no<br />

longer required.<br />

Any adverse impacts associated with the site and construction will<br />

be minor and measures to reduce impacts identified within this<br />

REF will be implemented during construction, as far as practicable.