• Regular inspection <strong>of</strong> plant and equipment will be undertaken to ascertain that fitted<br />

emission controls are operating efficiently.<br />

• Plant or machinery will not be left idling.<br />

• Stockpiles will be maintained and contained appropriately, which could include covering<br />

or regular watering to minimise dust.<br />

• Minimal work will be undertaken during high wind periods.<br />

• Trucks transporting spoil and other waste materials from site will be covered<br />

appropriately.<br />

Disturbed areas will be rehabilitated after construction.<br />

Biodiversity<br />

• No trees will be removed during construction.<br />

• Care will be taken to minimise the spread <strong>of</strong> weeds. Appropriate management and disposal<br />

<strong>of</strong> any noxious weeds, will be undertaken in consultation with Sutherland Shire Council.<br />

• The work site will be inspected for any trapped or injured fauna at the start <strong>of</strong> each day.<br />

• Trenches/excavations will be covered at the end <strong>of</strong> each day and inspected before they are<br />

backfilled.<br />

Noise and Vibration<br />

Please refer to Table 2 Possible Construction Noise Control Measures.<br />

Heritage<br />

• If a non-Aboriginal historical relic is discovered, all work likely to affect it will cease and the<br />

Project Manager will be contacted. The RailCorp heritage staff and the NSW Heritage<br />

Branch in the Department <strong>of</strong> Planning and Infrastructure will be notified as required. An<br />

investigation will be undertaken by a suitably qualified archaeologist to identify suitable<br />

measures to reduce the impact on the relic discovered before work resumes.<br />

• Should Aboriginal heritage items be uncovered, all work in the vicinity will cease and the<br />

Project Manager and RailCorp heritage staff will be notified immediately. The Manager <strong>of</strong><br />

the Planning and Aboriginal Heritage Section, Metropolitan Branch, Environment Protection<br />

and Regulation Division, Office <strong>of</strong> Environment and Heritage (OEH) will be notified in<br />

accordance with Section 89A <strong>of</strong> the National Parks and Wildlife Act 1974. The Local<br />

Aboriginal Land Council will be notified and an assessment by an archaeologist will be