arranged to determine the significance <strong>of</strong> the objects and any other requirements before<br />

work resumes.<br />

Waste<br />

• All waste will be classified in accordance with the Waste Classification Guidelines (DECCW<br />

2009) and transported to a place that can lawfully accept the waste.<br />

• Any material that may be classified as a hazardous waste will be dealt appropriately and in<br />

accordance with RailCorp procedures.<br />

• Packaging will be minimised, where possible and where the safety and delivery <strong>of</strong> services<br />

is not compromised.<br />

• Wherever possible, suitable excavated spoil will be reused on site for backfilling,<br />

landscaping and other purposes.<br />

• Any spoil or waste material tracked onto roads will be swept up immediately.<br />

• Adequate numbers <strong>of</strong> bins and waste containers will be placed at the site. The site manager<br />

will ensure bins are not overflowing and are appropriately covered.<br />

• All waste will be removed from the site when work is completed.<br />

Contaminated Land and Hazardous Materials<br />

• During excavation, site workers will look for signs <strong>of</strong> potential contamination such as<br />

the presence <strong>of</strong> waste and/or other imported materials, odours, soil colouring, floating<br />

layers in groundwater etc.<br />

• If any contamination is encountered or suspected, work will stop immediately and the<br />

site will be fenced <strong>of</strong>f.<br />

• Any potential contamination will be investigated and work resumed only when<br />

approved by the <strong>Site</strong> Supervisor.<br />

• A remedial action plan will be prepared before clean up operations begin.<br />

• The site will be validated before work begins.<br />

• Contaminated soil will be segregated in a special container before classification and<br />

disposal.<br />

Visual Aesthetics and Urban Design<br />

• The construction site will be kept tidy and rubbish free.