Clause 228 Factor Impacts Comments<br />

(i)<br />

Any degradation <strong>of</strong> the quality<br />

<strong>of</strong> the environment<br />

nil<br />

The proposed work will not involve the<br />

removal <strong>of</strong> large areas <strong>of</strong> vegetation or<br />

adversely impact waterways.<br />

(j)<br />

Any risk to the safety <strong>of</strong> the<br />

environment<br />

-ve<br />

short-term<br />

During construction there is a risk to the<br />

environment due to accidental spills and<br />

sedimentation but these risks will be<br />

minimised through the implementation <strong>of</strong><br />

the proposed control measures.<br />

(k) Any reduction in the range <strong>of</strong><br />

beneficial uses <strong>of</strong> the<br />

environment<br />

nil<br />

Works are to take place on RailCorp land<br />

and will not adversely affect adjacent land<br />

uses (which include commercial and<br />

recreational). Access along the<br />

pedestrian/bike path will not be affected<br />

during construction. <strong>Train</strong> services will not<br />

be affected during the construction<br />

phase.<br />

(l)<br />

Any pollution <strong>of</strong> the<br />

environment<br />

-ve<br />

short-term<br />

During construction there is a risk <strong>of</strong><br />

noise and air pollution. These risks will be<br />

minimised through the implementation <strong>of</strong><br />

the proposed control measures.<br />

(m) Any environmental problems<br />

associated with the disposal <strong>of</strong><br />

waste<br />

-ve<br />

short-term<br />

During construction, it is possible spoil<br />

may be contaminated and an appropriate<br />

remediation plan and/or waste disposal<br />

method will be implemented.<br />

(n) Any increased demands on<br />

resources, natural or otherwise<br />

which are, or are likely to<br />

become in short supply<br />

nil<br />

Construction materials are readily<br />

available and will be sourced from local<br />

contractors where possible.<br />

(o) Any cumulative environmental<br />

effect with other existing or<br />

likely future activities<br />

nil short-term<br />

+ve long-term<br />

The distance between the different DTRS<br />

sites is such that cumulative noise, air<br />

quality and traffic impacts are not<br />

expected.<br />

(p) Any impact on coastal<br />

processes and coastal hazards,<br />

including those under projected<br />

climate change conditions<br />

nil<br />

The proposed works are not located on<br />

the coastline and have not been identified<br />

as within an area that will be subject to<br />

increased sea level rise.<br />

Key: -ve = Negative Impact, NIL = No Impact, +ve = Positive Impact<br />

EPBC Act 1999 Factors<br />

Matters <strong>of</strong> national environmental significance must also be considered as a requirement <strong>of</strong> the<br />

EPBC Act, and are considered in Table 4.